background image

User Manual

R

AC

DC

Alarm

Normal

Grid-connected PV Inverter

Summary of Contents for SUN-1.5K-G

Page 1: ...User Manual R AC DC Alarm Normal Grid connected PV Inverter ...

Page 2: ... 17 5 5 Inverter monitoring connection 17 5 6 Installation of datalogger 5 7 Configuration of datalogger 6 Startup and Shutdown 6 1 Start up the inverter 6 2 Inverter Shutdown 7 Zero export function Optional 7 1 Zero export function Optional 7 2 Sensor Clamp optional 7 3 Use of limiter function 18 18 19 19 19 20 20 23 25 7 4 Notes while using limiter function 8 General Operation 8 1 The initial in...

Page 3: ...d About This Manual The manual mainly describes the product informa on guidelines for installa on opera on and maintenance The manual cannot include complete informa on about the photovoltaic PV system How to Use This Manual Read the manual and other related documents before performing any opera on on the inverter Documents must be stored carefully and be available at all mes Contents may be perio...

Page 4: ...ors including Inserted spring x1 AC power connectors x1 User manual User manual x1 Sensor Clamp op onal x1 Moun ng stainless steel screws M4 12 x4 Wall moun ng bracket x1 Grid ed PV String Inverter x1 DDSU666 DIN RAIL METER 230V 5 60 A 800imp kWh Meter op onal x1 Datalogger op onal x1 Stainless steel an collision bolt M6 80 x2 ...

Page 5: ...uc ons which if not correctly followed could result in burns Safety Hint Note symbol indicates important safety instruc ons which if not correctly followed could result in some damage or the destruc on of the inverter Warning Warning symbol indicates important safety instruc ons which if not correctly followed could result in serious injury or death Shock Hazard Prohibit disassembling inverter cas...

Page 6: ... local power supply department the professionals can connect the inverter to the grid 5 Please take appropriate an sta c measure 6 Please install where children can not touch 7 When star ng the inverters first close the circuit breaker at the grid side then close the DC side when closing the inverters first disconnect the circuit breaker at the AC side then disconnect the DC side 8 Don t insert or r...

Page 7: ...anel of the inverter Please see table 3 1 for details Table 3 1 Status indicator lights 3 Opera on Interface Explanation Inverter detects DC input Low DC input voltage Grid Connected Grid Unavailable Under normal opera ng Stop opera ng Detected faults or report faults Under normal opera ng Indicator status DC AC NORMAL ALARM on off on off on off on off ...

Page 8: ...lling through the displayed op ons the Up and Down keys Access to modify the adjustable se ngs the Esc and Enter keys The two line Liquid Crystal Display LCD is located on the front panel of the Inverter which shows the following informa on Inverter opera on status and data Service messages for operator Alarm messages and fault indica ons Esc Up Down Enter ...

Page 9: ...freely To avoid overhea ng always make sure the flow of air around the inverter is not blocked Exposure to direct sunlight will increase the opera onal temperature of the inverter and may cause output power limi ng It is recommended that inverter installed to avoid direct sunlight or raining To avoid overhea ng ambient air temperature must be considered when choosing the inverter installa on loca o...

Page 10: ...may result in less than expected output power If install more than one inverter must leave at least 500mm gap between each inverter And each inverter must be at least 500mm above and below And must install the inverter at the place where children cannot touch Please see picture 4 3 Consider whether the installa on environment is helpful to see the inverter LCD display and indicator status clearly ...

Page 11: ...verter Pic 4 3 Installa on Gap 4 2 Inverter Installa on The inverter is designed according to the wall mounted type installa on please use the wall mounted the brick wall of the expansion bolt when installing Moun ng bracket Pic 4 4 Inverter Installa on ...

Page 12: ...lla on Pic 4 5 Inverter hanging plate installa on 2 Ensure that the posi on of the installa on holes on the wall is in accordance with the moun ng plate and the moun ng rack is horizontally placed 3 Hang the inverter to the top of the moun ng rack and then use the M4 screw in the accessory to lock inverter heat sink to the hanging plate to ensure that the inverter will not move Pic 4 6 Inverter in...

Page 13: ...ious damages to the inverter Safety Hint Before connec ng inverter please make sure the PV array open circuit voltage is within the 550V of the inverter Safety Hint Before connec on please make sure the polarity of the output voltage of PV array matches the DC and DC symbols Safety Hint Please use approved DC cable for PV system Pic 5 1 DC male connector MC4 Pic 5 2 DC female connector MC4 Cable t...

Page 14: ... 3 b Crimping metal terminals with crimping pliers as shown in picture 5 4 c Insert the contact pin to the top part of the connector and screw up the cap nut to the top part of the connector as shown in picture 5 5 Pic 5 3 Disassemble the connector cap nut 7mm 7mm Pic 5 5 connector with cap nut screwed on Pic 5 4 Crimp the contact pin to the wire ...

Page 15: ...AC terminal to the AC side of the inverter the AC side is equipped with single phase AC terminals that can be conveniently connected Flexible cords are recommended for easy installa on The specifica ons are as shown in Table 5 2 Warning Prohibit using a single circuit breaker for mul ple inverters prohibit the connec on of load between inverter circuit breakers Table 5 2 Cable informa on Warning Us...

Page 16: ...tor body has two locking holes and press the locking valve in the hole inward to separate the matching socket from the sleeve Step 4 Insert the cable L N PE into the sealing sleeve and sleeve 1 Matching socket 2 Sleeve 3 Sealing core 4 Sealing nut Pic 5 7 AC connector structure 1 2 3 4 Pic 5 8 Strip AC cable 8 15mm 40mm Step 3 Use strippers to strip the protec ve sheath and insula on layer of the ...

Page 17: ...wn in picture 5 10 Step 5 Use the hexagon screwdriver loosen the bolts of the socket in turn and insert each cable core into the corresponding jack and set each screw The connec on hole of AC connec on terminal labeling is shown in picture 5 9 Pic 5 9 AC Connector Hole Pa ern Pic 5 10 AC input connec on ...

Page 18: ...machine systems all PE cables of the inverter need to be connected to the same grounding copper platoon to ensure the equipoten al connec on The installa on of the shell ground wire is shown as picture 5 11 Pic 5 11The installa on of the shell ground wire Warning Inverter has built in leakage current detec on circuit If an external leakage current protec on device is connected its opera ng current...

Page 19: ... AC connec on it is recommended to install a circuit breaker to prevent overcurrent See table 5 3 below Table 5 3 Recommended current protector specifica ons 5 5 Inverter monitoring connec on Inverter has the func on of wireless remote monitoring The inverter with Wi Fi func on is equipped with Wi Fi Plug to connect the inverter and network Wi Fi Plug s opera on installa on Internet access APP down...

Page 20: ...screws Insert the datalogger into the interface and fix it with a screw The configura on of the datalogger needs to be performed a er various electrical connec ons have been completed and the inverter DC power on When the inverter is on the DC power it is determined whether the datalogger is normally electrified The LED light shines out of the shell Pic 5 13 Datalogger installa on diagram 5 7 Configur...

Page 21: ...shall not exceed the rated power of each channel Must follow below steps while shu ng down the inverter 1 Switch off the AC breaker 2 Wait for 30 seconds turn off the DC switch if any or simply disconnect the DC input connector The inverter will close the LCD and all indicators within two minutes When start up the single phase string inverter should fellow below steps 1 First switch on the AC breake...

Page 22: ...he inverter and the u lity grid the specs of the AC switch are determined by the power of load The AC switch we recommend to connect to the inverter output can refer to Table 7 2 If there is no integrated DC switch inside the inverter you purchased we commend you to connect the DC switch The voltage and current of the switch depend on the PV array you access The string inverter supports zero expor...

Page 23: ...connector L N L N 1 230V 2T 5 6 7 8 9 10 2 3 A B 4 GND 1 COM 2 AC Breaker 2 1 4 3 CHINT DDSU666 DDSU666 DIN RAIL METER 230V 5 60 A 800imp kWh 2 5 6 1 4 7 8 3 Output RS 485 Grid input Pic 7 3 CHINT meter Pic 7 2 Connec on diagram of EASTRON meter Pic 7 3 Parameter se ng When the EASTRON meter connected successfully it will shows SN 2 System connec on diagram for the CHNT meter ...

Page 24: ...5_A 485_A GND RS 485 Female connector 1 2 3 4 RS 485 Male connector L N L N AC Breaker When the CHNT meter connected successfully it will shows SN 1 Pic 7 4 Parameter se ng Warning Ensuring grid input cables connect 1 3 port of energy meter and inverter AC output cables connect 2 4 port of energy meter when connec ng Pic 7 4 Connec on diagram of CHINT meter ...

Page 25: ...page otherwise the se ngs are invalid 6 If set up successfully you can return to the menu interface and display the LCD to home page by press the up down bu on If it displays meter power XXW the zero export func on se ng is completed Shown as picture 7 15 Meter Power 20W Pic 7 5 Zero export func on via energy meter turn on 7 2 Sensor Clamp op onal The inverter has integrated export limita on func ...

Page 26: ...incoming line In order to make it easier for you to use the built in limiter func on of the inverter we have specifically given the wiring diagram as shown in Picture 7 1 the red lines connected to the u lity grid said wire L blue line shows the zero line N yellow green line shows the ground wire PE We recommend installing a AC switch between the inverter outlet and the u lity grid the specs of the...

Page 27: ...ou can turn on or turn off the limit func on by choosing up down bu on please press enter bu on to confirm when se ng done 5 Move the cursor to confirm press ENTER to save the se ngs and exit the running parameters page otherwise the se ngs are invalid 6 If set up successfully you can return to the menu interface and display the LCD to home page by press the up down bu on If it displayed as u lity po...

Page 28: ... power 7 5 How to browse the load power of your PV grid e plant on monitoring pla orm If you want to browse load power of the system and how much energy KWH does it export to grid inverter output power is used to power the load firstly and then the surplus energy will feed into grid You also need to connect the meter according to Pic 7 12 A er the connec on completed successfully the inverter will ...

Page 29: ... 27 Secondly go to plant page if it shows the PV power load power and grid power which means the configura on is correct ...

Page 30: ...on number and Wifi connec on state of the inverter Pic 8 1 LCD opera on flow chart Note These parameters will be avaiable a er the meter is connected successfully Otherwise it won t show Start Device Informa on Fault Record ON OFF Setup System Param Run Param Protect Param Comm Param LCD Main menu Total DC Power Meter ImpEp ExpEp LoadEp Load PV1 and Power Grid and Freq Time E Day and E Total PV VA F...

Page 31: ...3 Total input power Total DC Power 0W Pic 8 5 Grid voltage current and frequency informa on Grid 234V 0 0A Freq 0 00Hz Pic 8 8 Time 21 05 2020 15 57 08 Pic 8 9 Meter power Meter Power 0W ImpEp Daily energy purchased from grid Total Total energy purchased from grid Pic 8 10 Electrical energy ImpEp 0 00KWh Total 0 00KWh Pic 8 7 PV genera on E Day Daily genera on E Total Total genera on E Day 0Wh E T...

Page 32: ...n LoadEp Daily consump on Total Total energy consump on You can see the LCD so ware Ver0201 and control board So ware Ver1970 In this interface there are parameters such as rated power communica on addresses Pic 8 14 Device informa on 8 2 1 Device informa on Device Info Fault Record GL1000 SN 01 ID 0000000012 ID 0000000012 Ver0201 Ver1970 There are five submenus in the Main Menu 8 2 Submenus in the...

Page 33: ...hen the turn on is cked again it will go to self test program again If it passed the dadself test it will start to work again Pic 8 16 ON OFF se ng 8 2 3 ON OFF se ng ON OFF Setup Turn ON Turn OFF Turn ON OK Cancel Turn OFF OK Cancel Pic 8 17 Submenus of the parameter setup There are five submenus in the setup Se ng includes system param run param protect param comm param All of these informa on fo...

Page 34: ... Language Set Display Set Factory Reset Pic 8 20 Language Bright Keep Delay time 055 Delay time 055 OK Cancel Confirm Reset Cancel Pic 8 21 LCD Screen se ngs Pic 8 22 Delay me set Pic 8 23 Reset to factory se ng Pic 8 24 Password 8 4 Running param set PassWord Note Password required only for access authorized engineer Un authorized access may avoid the warranty The ini al password is 1234 ...

Page 35: ...ct SUN limiter then set here to ON Meter_ct 0 Limiter ON Pic 8 29 Pic 8 30 Feed in 50 MPPT Num 0 Feed_In it is used to deploy how much power can be feed into grid For example Feed_in 50 of the 3W model which means Max 1 5KW power can be feed into grid And this parameter is valid only a er connec ng a meter and the meter func on is ON Adjust the output ac ve power in Reac veP Adjust reac ve power o...

Page 36: ...lt Detec on LimExMode AVG Meter OFF ARC OFF WindTurbine ARC CLR WindTurbine ARC ON WindTurbine LimExMode MIN Meter OFF Pic 8 31 ac ve power droop OFDMode OFF ARC ON OFDMode ON ARC ON OFDMode HYS ARC ON OFDPoint 0 00 OFDMode HYS OFDerate 0 0 OFDPoint 0 00 ...

Page 37: ...int 0 00 LimExMode There re two kinds of zero export modes for the syetem when connec ng meter AVG According to the average power of three phase LimExMode AVG Meter OFF Ac ve power droop func on enable disable OFDMode OFF ARC ON Clear arc fault manually ARC CLR WindTurbine Arc fault detec on func on enable disable ARC ON WindTurbine MIN According the minimum power among three phase LimExMode MIN M...

Page 38: ...s don t need to reset it The password is same as 8 4 Running param 8 5 Protect Param Pic 8 32 Password 00 INMETRO 00 EN50549 00 EN50438 00 IEC61727 00 CUSTOM 00 VDE_4105 00 UTE_C15 00 RD_1699 00 CEI_0_21 00 G98_G99 00 AS4777 OK Cancel Note Engineer only AC OverVoltage U1 260 0V AC LowVoltage U1 195 5V ...

Page 39: ...AC OverVoltage U2 265 0V AC LowVoltage U2 185 0V Tripping Time2 Time2 500ms Tripping Time2 Time2 500ms AC OverVoltage U3 270 0V AC LowVoltage U3 160 0V Tripping Time3 Time3 200ms Tripping Time3 Time3 200ms Tripping Time1 Time1 2000ms Tripping Time1 Time1 2000ms AC OverFreq 2 53 00Hz AC LowFreq 2 47 00Hz ...

Page 40: ...he requirements of your current country s grid regula ons If you are not clear about it please consult your installer Tripping Time2 Time2 500ms Tripping Time2 Time2 500ms AC OverFreq 3 54 00Hz AC LowFreq 3 46 00Hz Pic 8 33 CUSTOMIZED Rated Voltage 127 220V OK Cancel Tripping Time3 Time3 200ms Tripping Time3 Time3 200ms ...

Page 41: ...o high and the touch can cause burns Turn off the inverter and wait for it cooling then you can clean and maintain Warning No solvent abrasive materials or corrosive materials can be used for cleaning any parts of the inverter Error code Description Ongrid Single Phase F01 DC input polarity reverse fault Check the PV input polarity F03 DC leakage current fault Hardly appear the code Never ever happ...

Page 42: ...t the inverter if the error s ll exists please contact your installer or Deye service Three phase current over current fault F22 Contact your installer for help Crash stop if there is a stop bu on F19 1 When inverter is running wifi plug plugin will occur F19 2 Restart the inverter or factory reset if the error s ll exists please contact your installer or Deye service All hardware failure synthesis...

Page 43: ...e service F41 AC Line W U over voltage Check the AC voltage protec on se ng And Check if the AC cable is too thin Check the voltage difference between LCD and meter F30 AC main contactor failure 1 Check relays and AC voltage of relays 2 Check relays driver circuit 3 Check if the so ware is not suitable for this inverter Old inverter not have relays detec on func on 4 restart the inverter if the fau...

Page 44: ...nput voltage is low and it always happens in the early morning 2 Check PV voltage and Ubus voltage When inverter is running then showing F56 maybe Loss of driver or need update firmware 3 Restart the inverter if the fault s ll exists contact your installer or Deye service F57 AC reverse irriga on AC reverse irriga on F58 AC grid U over current Hardly appear the code Never ever happened so far F59 A...

Page 45: ... 1 5K G 2 1 5 1 65 6 5 7 2 97 3 97 1 SUN 1K G 1 3 1 1 1 4 3 4 8 0 5 47 52 or 57 62 op onal 19 5 1 1 220 230 Op onal 160 300 this may vary with grid standards 50 60 Op onal Single phase SUN 2K G 2 6 97 3 97 1 2 2 2 8 7 9 6 0 8 leading 0 8 lagging 3 SUN 3K G 3 9 97 5 97 3 3 3 3 13 14 3 Grid Current THD Transformerless Size mm W H D Weight kg Topology 1W Night Internal consump on Opera ng temperature...

Page 46: ...Add No 26 30 South Yongjiang Road Beilun 315806 Ningbo China Fax 86 0 574 8622 8852 Tel 86 0 574 8622 8957 E mail service deye com cn Web www deyeinverter com Ver 2 1 2021 12 28 ...

Reviews: