Installation Deltec CR TwinTech (Foto) 

 

 

1)

 

The scope of delivery includes a reactor with base plate, a controller incl. solenoid valve, a 

power supply unit, a feed pump, a funnel and handle extensions. 

 

Summary of Contents for CR TwinTech

Page 1: ...Installation Deltec CR TwinTech Foto 1 The scope of delivery includes a reactor with base plate a controller incl solenoid valve a power supply unit a feed pump a funnel and handle extensions...

Page 2: ...2 The Co2 cylinder pressure reducer and hoses are not included in the scope of delivery 3 Bring the plug connections together Pay attention to the colours Yellow Feed pump Red Circulation pump...

Page 3: ...4 Connect the hose of the feed pump at the bottom to the counter in the direction of the arrow 5 Connect the hose from the totalizer above to the reactor see above red arrow on reactor...

Page 4: ...6 Connect the hose from the pressure reducer of the Co2 bottle to the solenoid valve below in the direction of the arrow 7 Connect hose from solenoid valve to check valve to reactor...

Page 5: ...cap and screw on funnel OR attach handle extensions and open cover Then the medium and then salt water can be filled in slowly 9 We filled the medium via the funnel up to the middle of the Deltec bay...

Page 6: ...10 We recommend ROWA lith W in grain size 12 16 mm 11 Fill up slowly with salted water...

Page 7: ...12 Unscrew funnel and close reactor with cover Tighten all screw connections hand tight 13 Open both vent taps...

Page 8: ...14 Connect the power supply unit from the controller to the mains Controller is automatically connected to 15 Set the Waterflow 24h to 50 with the arrow keys...

Page 9: ...16 Set Pump Speed to 100 with the arrow keys 17 Circulation pump starts water is running...

Page 10: ...on for approx 4 seconds Water is now pumped into the reactor and the reactor is completely degassed Repeat this process until the water comes out of the ventilation taps 19 Hold the outlet hose up hig...

Page 11: ...20 When the water comes out of the two ventilation taps close them 21 Vent taps are now closed...

Page 12: ...nnect the mains plug reconnect the mains plug and wait until the circulation pump starts the water circuit Now connect the float switch to the controller 23 Now all hoses and cables are connected to t...

Page 13: ...24 Unscrew the CO2 bottle 25 The gas now flows into the reactor...

Page 14: ...d and set it to 35 recommended 27 After the first start up measure the KH value in the aquarium at regular intervals and then use the controller to adjust the reactor up or down using the Waterflow fu...