background image

28-11-2019

for

Orangery

3,2x2,83x2,75m

 

Manual

Summary of Contents for GH152015

Page 1: ...28 11 2019 for Orangery 3 2x2 83x2 75m Manual...

Page 2: ...PRODUCT SIZE LxWxH 320x283x275cm PLEASE READ CAREFULLY BEFORE ASSEMBLY Assembly Instructions...

Page 3: ...CONTENTS 1...

Page 4: ...T climb or stand on the roof Heavy articles should not be leaned against the greenhouse 5 Keep the roof and gutter clear of snow dirt leaves Allowing snow to build up on the roof may damage the produc...

Page 5: ...ovements The hollow box profile aluminium framing is much stronger than other greenhouses and it can withstand much greater pressure Wind resistance up to 12th typhoon 40M S or 120KM H Weight Support...

Page 6: ...integral gutter Downpipes are also included as standard so you can collect rainwater 7 Remove approximately 2 inches of film from all sheet edges before installing and remove all film immediately aft...

Page 7: ...GH152010 5 PART NO QTY L08A 5 L10 1 J01 6 L01A 6 L07 6 B 6 J02 6 3 S01 M6X12 A 6 PART NO QTY L02A 6 L23A 12 L23B 14 L23C 35 K 34 L23D 44 L02K 11 1 W01 W11 6 S01 M6X12 6 M03 M6 6 6 L03A...

Page 8: ...4 W06 2 J 8 4 Z03 4X10 Windowx2pcs PA RT NO QTY Door PA RT NO QTY S 03 11 M8X60 W05 11 Ba se L16A 4 L17 1 L18A 1 L16B 4 L18C 1 L18D 2 L11H 4 L11J 4 4 4 4X50 Z04 D 2 S 02 2 M8X35 M02 M8 2 J L02B 4 L02...

Page 9: ...1 2 Y2 2 Y3 2 Y4 2 Y10 2 Y11 2 Y6 22 Y5 4 Y13 4 Y 6 Y 6 Y 6 Y 6 Y 1 Y 2 Y 3 Y 1 0 Y 4 Y 6 Y 6 Y 6 Y 6 Y 1 Y 2 Y 3 Y 1 0 Y 4 Y5 Y11 Y11 Y13 Y6 Y6 Y 5 Y 6 Y 6 Y 1 3 Y 6 Y 6 Y5 Y6 Y6 Y13 Y6 Y6 Y 5 Y 6 Y...

Page 10: ...9 L20 L19B L19A L19A B B B B W06 Y10 L11F L11F L11G L11G PART NO QTY L19A 4 L19B 2 L20 2 L11F 4 L11G 4 W06 2 J 8 Windowx2pcs 4 Z03 4X10 Y10 2 4 4X16D Z02...

Page 11: ...J J 1 1 2 2 L20 J L19A J L19A L19B 1 2 Push down the button on connector J before inserting it into the end of the frame profile After connector J has been fitted use the hole in the profile to tight...

Page 12: ...11 L11G L11G L11F L11F Y10 Y10 First the glazing panel Y10 should be loosely retained by the bar capping profiles L11F and L11G Next tap the bar capping gently into position with a rubber mallet...

Page 13: ...12 Z03 Z03 W06 Y10 Y10 Fix the W06 vent handles using Z03 screws...

Page 14: ...13 Y10 Fill the gap with silicone sealant on 4 sides to avoid any leaking...

Page 15: ...PART NO QTY L16A 4 L17 1 L18A 1 L16B 4 L18C 1 L18D 2 PART NO QTY 4 PART NO QTY Y11 2 4 4X50 Z04 D 2 S02 2 M8X35 M02 M8 2 Door 13 L11H 4 L11J 4 J...

Page 16: ...assemble the door frames using connector J as shown in the sketches below Put L16A into L17 and L18D and put L16B into L18A and L18C Push down the button on connector J before inserting it into the en...

Page 17: ...1J L11J Y11 Y11 L11H L11H L11H L11H Y11 Y11 First the glazing panels should be loosely retained by the bar capping profiles L11H and L11J Next tap the bar capping gently into position with a rubber ma...

Page 18: ...100mm 29mm 29mm 1 1 After Assembly Slide 2xS02 into L18D positioned 100mm away from each edge Secure S02 using M02 bolts then rotate the wheels to ensure free movement This is the method of adjusting...

Page 19: ...17 a b a b c c a b c It is essential the dimensions a b c are the same to ensure the base is square Expansion bolt in concrete Support at the corners only is inadequate Steel pegs in soil...

Page 20: ...2705mm 3123 5mm 18 106 3 395 PART NO QTY S03 11 M8X60 W05 11 395 395 395 395 395 395 395 395 395 395 Expansion bolts assembly This size is the inner specification of the product mm...

Page 21: ...es connectors and anchor brackets approximately in place Assemly all the L08A and L10 with connecter A Insert connector A into L08A and L10 tight the bolts with the special spanner provided when the c...

Page 22: ...O QTY L01A 6 1 1 1 1 2 2 L01A L01A L01A L01A L01A L01A Assembly L01A with connector A insert connector A into L01A tight the bolt with the special spanner when the it s in the right position Make sure...

Page 23: ...sure you pay close attention to the direction of the pins Assembly L07 and L01A with connector B insert connector B into L01A and L07 tight the bolt with the special spanner when the it s in the right...

Page 24: ...ART NO QTY L23A 6 L23B 12 L07 L08A L10 L23A L23B L23B L23B L23A L23B L10 L08A Tap the bar capping L23B into L10 L08A and L07 and L23A into L01A gently with a rubber mallet Please pay attention to the...

Page 25: ...QTY L23C 24 L23C L23C L23C L23C 1 2 L08A L10 Tap the bar capping L23C into L10 and L08A gently with a rubber mallet Make sure you leave 50mm between the two L23C in the middle for later assembly of L...

Page 26: ...L02A L02A 1 2 Put connector K into the slot of L07 L10 and L08A turn its direction until it goes into the hole on L02A Tight the bolt in the connector K with the spanner Pay attention to the direction...

Page 27: ...A 50mm 50mm 50mm 50mm PART NO QTY L23D 40 L23D L23D Tap the bar capping L23D into L01A and L02A gently with a rubber mallet Make sure you leave 50mm between the two L23D in the middle for later assemb...

Page 28: ...4 L23D L23D L01A L02A L01A L01A L02A L01A L23D L23A Tap the bar capping L23A and L23D into L01A and L02A gently with a rubber mallet Make sure you leave 50mm between the two L23D in the middle for la...

Page 29: ...K 22 L02K L02K L02K Put connector K into the slot of L02A and L01A turn its direction until it goes into the hole on L02K Tight the bolt in the connector K with the spanner Pay attention to the direc...

Page 30: ...28 L23C L02K PART NO QTY L23C 11 L23C Tap the bar capping L23C into L02K gently with a rubber mallet...

Page 31: ...3A S01 W11 W01 L03A J02 L07 L07 L03A M03 M6 2 M03 1 W01 Assembly L03A with connector B insert connector B into L03A tight the bolt with the special spanner when the it s in the right position Don t fo...

Page 32: ...30 PART NO QTY 4 L03A W11 4 S01 M6X12 4 M03 M6 4 M03 L03A Do the same for the left L03A...

Page 33: ...003 1 2 3 W04 W04 PART NO QTY GM80003 1 W04 1 Auto Cap Assembly Put automatic opener GM80003 through the central hole on W01 fig 1 Use plug W04 to pass over the hole on GM80003 fig 2 bend and secure i...

Page 34: ...capping L24A into L03A and L24B into L07 gently with a rubber mallet Make sure you leave 50mm between the two L24B in the middle for later assembly of L02D Do the same on the other side which you want...

Page 35: ...into L02E gently with a rubber mallet Make sure you leave 50mm between the two L25A in the middle for later assembly of L02C and leave 578mm between the two L25B in the middle for later assembly of L...

Page 36: ...e on L02D Tight the bolt in the connector K with the spanner Pay attention to the direction on the spanner Put connector N into the slot of L03A turn its direction until it goes into the hole on L02E...

Page 37: ...2D L25C L25E L25D L25D PART NO QTY L25C 2 L25D 4 L25E 2 Tap the bar capping L25C into L02C L25D insto L02D and L25E into L02E gently with a rubber mallet Do the same on the side which you want to asse...

Page 38: ...8 L24C L07 L07 L24C L24C 50mm Tap the bar capping L24C into L07 gently with a rubber mallet Make sure you leave 50mm between the two L24C in the middle for later assembly of L02B Do the same on the o...

Page 39: ...4 K 4 W11 4 S01 M6X12 4 M03 M6 4 Put connector K into the slot of L07 turn its direction until it goes into the hole on L02B Tight the bolt in the connector K with the spanner Pay attention to the dir...

Page 40: ...38 PART NO QTY L24D 4 L24D L02B L24D Tap the bar capping L24D into L02B gently with a rubber mallet Do the same on the other sides...

Page 41: ...e two holes on W01 secure them onto the two holes on cap W02 After secure S04 onto W02 turn the auto opener GM80003 clockwise so that it pushes up W02 leave some gaps between L03A and W02 for later pa...

Page 42: ...L12D Y1 2 L09 2 2 L22 Y2 2 Y3 2 Y4 2 Y1 Y2 Y3 Y4 L12D L09 L11B L12C L22 Panel Assembly Install the panels and aluminum bar capping in order as shown above tap these bar capping into the channels of ea...

Page 43: ...41 Fill the silicone sealant on the places shown above to avoid any water leaking Do the same on the other side...

Page 44: ...11B 8 4 L12B Y5 4 L09 4 Y13 4 L12B L11B L11B L09 Y5 Y13 Install the panels and aluminum bar capping in order as shown above tap these bar capping into the channels of each position properly with a rub...

Page 45: ...43 Fill the silicone sealant on the places shown above to avoid any water leaking Do the same on the other sides...

Page 46: ...vent along the groove in the L22 and fix it in the correct position using Z03 screws Ensure the manual vent is closed as shown Use a screw S01 to pass over Part Z and then put part Z 2pcs into the sl...

Page 47: ...L12A L11D 10 10 L12K Y6 20 PART NO QTY L12K L11A L12K L12A L11A L11D L11D Install the panels Y6 and aluminum bar capping in order as shown above tap these bar capping into the channels of each positi...

Page 48: ...NO QTY L11A 1 1 L12A L11E 1 1 L12K Y6 2 PART NO QTY L11E L12K L12A L11A Install the panels Y6 and aluminum bar capping in order as shown above tap these bar capping into the channels of each position...

Page 49: ...47 L14 D L14 Door M03 M03 1 PART NO QTY L14 1 M03 M6 3 L14 L09 L18D 1 1 1 M01 M01 M6 3 Rotate D the roller wheels to adjust the height of the door so it does not bind or rub on the bottom track...

Page 50: ...3 L14 L07 W01 W02 GM80003 1 3 PART NO QTY W03 2 4 4X14D Z02 1 2 3 2 L07 Z02 W03 L14 L04A L04A L04A L04A 1 Turn the auto opener GM80003 counter clockwise adjust the space between W02 and L03A to ideal...

Page 51: ...hole in L01A and L01B approximately 3 2mm diameter and 700mm up from the bottom Fix the J08 downpipe bracket with Z01 screws and then clip the J06 downpipe into the J08 bracket Fill some silicone sea...

Page 52: ...50 1 1 2 L08A L10 A L01A L07 B L01A L03A J11 Z05 J12 J11 Z05 J12 2 2 2 2 2 2 1 1 1 1 1 1 PART NO QTY J11 Z05 J12 12 12 12...

Page 53: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Reviews: