background image

Pre-Construction Mount Kit:  PMK-2000L 

The PMK-2000L is a pre-construction mount kit that has been developed for the Crestron 
Isys™ TPS-2000L, compact video touchpanel. Refer to the physical views (top, side, and 
front) of the PMK-2000L, shown below.  

16

6  5

inches 

#4-40 TAPPED HOLE (4 PLACES)
SCREWS SUPPLIED WITH TOUCHPANEL

FOR DRYWALL

FOR DRYWALL

FOR DRYWALL

FOR DRYWALL

NAIL OR SCREW

NAIL

21

32 inch

STUD

OFFSET

SCREW

SCREW

16 inches 

7

FOR DRYWALL

0.060 in

(0.152 cm)

THICK

TOP

VIEW

NAIL

2.406 in

(6.111 cm)

5.820 in

(14.783 cm)

PMK-2000L

STUD

SECURE 18 AWG

BUS WIRE IN

NOTCH TO HANG

CABLES AWAY

FROM DRYWALL

CUTTING TOOLS.

5.086 in

(12.918 cm)

CUTOUT

DIMENSIONS

NOTE:

PRE-CONSTRUCTION

PLATE MUST BE

LEVEL BEFORE

APPLICATION OF

SHEET ROCK

0.342 in

(0.879 cm)

PINS USED WITH

OPTIONAL MMK-2000L

4.65 in.

(11.81 cm)

6.60 in.

(16.76 cm)

ASSEMBLED

VIEW

FRONT

VIEW

SIDE

VIEW

COVER PLATE

INSTALLED

 

Assembled View 

The PMK-2000L consists of a single metal plate, shown above, which can be fastened to the 
stud of a framed wall prior to hanging drywall. The plate is designed to provide the necessary 
support for a single touchpanel and can mount to the right or left side of a stud. Confirm that 
the PMK-2000L is level before application of sheet rock. Refer to “Assembled View”, shown 
above. The PMK-2000L includes an 18 AWG bus wire to secure touchpanel cabling during 
drywall installation and to avoid damaging the cables when the opening is routed.  

A rectangular opening with the dimensions shown above must be made in the drywall. Verify 
that the opening exposes the #4-40 tapped holes in each corner. If the opening for the 
touchpanel in the drywall is too large, two pre-construction accessories are available to make 
adjustments. Use the optional TMK-2000L (Trim Ring Kit) to provide a smooth edge at the 
opening. This option provides a finished appearance and is preferred when wallpaper is 
hung. Use the optional MMK-2000L (Mud Ring Kit) to fill in larger irregularities around the 
opening (requires plastering). Standard drywall nails or screws to attach the PMK-2000L are 
not supplied (length can vary). Complete the installation by either installing the touchpanel, 
leaving the hole open (if permitted by local building codes), or installing the supplied cover 
plate with #4-40 x 1

1

/

2

” screws. Refer to “Cover Plate Installed” view, shown above. 

Further Inquiries 

If after reviewing this sheet, you cannot locate specific information or have questions, please 
take advantage of Crestron's award winning customer service team by calling:  

• 

In the US and Canada, call Crestron’s corporate headquarters at  
1-888-CRESTRON [1-888-273-7876].  

• 

In Europe, call Crestron International at +32-15-50-99-50. 

• 

In Asia, call Crestron Asia at +852-2341-2016. 

• 

In Latin America, call Crestron Latin America at +5255-5093-2160.  

• 

In Australia and New Zealand, call Crestron Pacific at +613-9480-2999. 

 

Crestron Electronics, Inc. 

Installation Guide – DOC. 6018A 

15 Volvo Drive 

Pre-Construction Mount Kit:  PMK-2000L   

Rockleigh, NJ 07647 

07.03 

Tel: 888.CRESTRON 

Specifications subject to change without notice. 

Fax: 201.767.7576  

www.crestron.com

 

 

Reviews: