background image

 

Installation Instructions 

 

MT10-10  

Required Crew: 2 Required 
Concrete: 10-12, 80 lb. bags  

Required Tools:  

● Wheelbarrow  
● Step Ladder (6’ or taller)  
● Shovel  
● Tape Measure  
● Digging Bar or Pick  
● Level  
● Allen Wrench (Provided)  
● Open end or Box Wrenches: 9/16”, ¾” 
● Hammer or Mallet  
● Ratchet Handle & Sockets: 9/16”, ¾” 
● Marker Pen  
● Drill: Cordless or electric, or impact driver  

 

Component Playgrounds is concerned about the safety of your vision. It 
is important that you choose to protect your vision by wearing proper 
safety glasses during each and every phase of this construction 
process.  

PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNING  

The MT10-10 can be installed as a one day project. The normal time 
required to install the MT10-10 is about 2-4 hours for a two man crew. This 
time requirement will vary dependent upon the composition of the soil and 
the speed of the installers. Mix and pour the concrete as the last step. 

*Before digging, please obey local laws by notifying your local 
underground utilities marking organization*  

Summary of Contents for MT10-10

Page 1: ...n It is important that you choose to protect your vision by wearing proper safety glasses during each and every phase of this construction process PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BE...

Page 2: ...he ground with the bottom of the ladder laying just over the hole where it will finally stand Hint Be sure to situate the ladder so that when the unit is finally standing the rungs and the third leg b...

Page 3: ...rd leg Insert 3 8 x 31 2 Hex Bolt and loosely thread 3 8 Nut into the bottom hole Nut will not thread all the way on and bolt will be loose This is to act as an anchor in the concrete and does not nee...

Page 4: ...Model MT10 10...

Page 5: ......

Page 6: ...them in place Refer to Top View Diagram on the previous page for spacing Step 2 Slide the ends of the 10 Top Rail as far as it will go into the Sleeve of the Triple End Step 3 Insert and tighten four...

Page 7: ...Model MT10 10 Installation Diagrams 1 Hole Sizes for Cementing in the Set 2 A Frame Leg Assembly 3 Third Leg Sleeve...

Page 8: ...g top rail Tighten securely so that the hanger is firmly attached in place and cannot slide or swivel along top rail 3 Attach carabiner with chain through the ring Note We recommend you check the pend...

Page 9: ...azards in this type of equipment when used improperly Children should be instructed as to proper caution to take in its use Equipment should NOT be used when it is wet or icy Equipment should only be...

Page 10: ...discolored or may eventually rust Should this happen a touch up using a cold galvanizing compound followed by a coat of silver aluminum spray paint will make them look new again These items can be pur...

Page 11: ...includes a vinyl canopy this product should be inspected occasionally for wear and will need to be replaced as necessary Depending upon your environmental conditions the normal life expectancy of the...

Page 12: ...le helmets when using playground equipment 4 Remove drawstrings from hoodies and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of strang...

Page 13: ...t cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or cons...

Page 14: ...ipt Invoice Number Model s For safety please inspect all moving parts on a regular basis At least yearly Especially paying attention to wear within the swing hanger Customer Information Name Address C...

Reviews: