background image

Instructions for Hi-Striker X-treme 

Assembly and Installation 

1)  Start by placing the sawhorses that will support the tower while assembling (you 

will need 4 to give you a level surface). **Note - During the assembly process, 
place the Top Sign where the base will be mounted when the game is assembled 
& erect. 

2)  Place the upper tower section onto the sawhorses (LED side facing upward). 

3)  Place the lower tower section onto the sawhorses with the LEDs facing upward 

also. 

4)  Slowly slide the upper tower section into the bottom section. When the two-tower 

section are close enough, start connecting the mating white Molex 
connectors. When sliding the upper section into the lower section be careful not 
to allow the wires to be pinched between the tower sections. These connectors 
should be able to be connected without removing the back panels. However, if 
needed you can remove and re-install the panels. 

5)  Remove the lower LED board from the upper tower section. Start by gently 

pulling back the black gasket on either side of the LED board to expose the 
screws. Once the tower sections are close enough, plug the upper LED board of 
the lower section into the LED board on the upper section (short cable w/red 
connector). 

6)  Reinstall LED board screws and secure LED gasket back into place. 

7)  Bolt the tower sections together using the (4) 3/8 x 1" hardware included in the 

hardware kit. 

8)  Once the tower sections are securely bolted together, use the weatherproof tape 

provided on the Lexan seam. Be sure that the tape goes under both of the Lexan 
gaskets and is securely adhered to the Lexan. This is a crucial part of 
weatherproofing the game. 

9)  Rotate the full tower body so that the LEDs are now facing downwards. 

10)  Slide the base onto the pole of the lower tower section. Be sure to leave enough 

room to run the wires from the tower section into the base. **Note - The 
transformer faces to the back of the tower. 

11)  Slowly bolt the base to the tower section. Be sure no wires get pinched between 

the base and tower section. 

12)  Install the PCB enclosure. Be careful not to damage the black connectors on the 

back of the box or tower. Gently angle and lower the control box into place while 

Summary of Contents for Hi-Striker X-treme

Page 1: ...he black gasket on either side of the LED board to expose the screws Once the tower sections are close enough plug the upper LED board of the lower section into the LED board on the upper section short cable w red connector 6 Reinstall LED board screws and secure LED gasket back into place 7 Bolt the tower sections together using the 4 3 8 x 1 hardware included in the hardware kit 8 Once the tower...

Page 2: ...ign onto the tower section using the hardware provided and BOTH black gaskets Re install the back panel on the Top Sign 18 Install the guy wire cables The longest ones go to the upper section and the shorter ones go to the lower section For a 45 game there will be 3 different lengths and 3 guy wire attachment points on the tower 19 Install the Pull Up cable to the same stud as the guy wire cable o...

Page 3: ...ritical weatherproofing step Tools Needed for Hi Striker X Treme 7 8 open box end wrench Tower Base Hardware 3 4 open box end wrench Skill Select Mounting Hardware 9 16 open box end wrench Guy wire Bracket Hardware 7 16 open box end wrench PCB Enclosure 3 8 drive ratchet 7 8 socket Pocket Top Sign Bolts 3 4 socket Packing hardware 9 16 socket Guy wire hardware 1 2 socket New Style Park Guy wire Cl...

Page 4: ...n experienced operator is required Cherry Picker 30 35 reach to lift a person up to the back of the tower to disconnect the crane from its attachment points Fencing To securely enclose the Hi Striker play field before operation Labor Please have adequate staff to help with the basic assembly and to erect the tower Power Please have the required power 220v 20amp run to the location Also temporary p...

Reviews: