SH-1320W_ii_190813
Pg 1
Showerhead
SH-1320W-ZZ
Shower & Waterfall Showerhead
Installation Instructions
1
2
•
Place SHOWERHEAD (
3
) onto ROUGH
VALVE (
2
) and confirm that it is level
•
Mark hole locations on finished wall
•
Remove SHOWERHEAD (
3
) from ROUGH
VALVE (
2
)
•
Using a ¼” drill bit, drill through TILE (
4
) and
BACKERBOARD (
5
)
IMPORTANT:
Do not drill into BRACE (
1
)
with ¼” drill bit
•
Using a 7/64” drill bit, drill into BRACE (
1
)
•
Apply SILICONE SEALANT (
6
) into drilled
holes and around ROUGH VALVE (
2
)
IMPORTANT: Read all instructions prior to installation and provide copy of instructions to consumer.
Operating Specifications:
Recommended Supply Pressure: 20 to 70 psi
*†
†
If water pressure exceeds 70 psi, install a Pressure-Reducing Valve (PRV).
REMOVING MUDGUARD
v
DRILLING HOLES IN TILE
CALIFORNIA FAUCETS RECOMMENDS THAT ALL PLUMBING PRODUCTS BE INSTALLED
BY A LICENSED PROFESSIONAL
No. 12
Screw Size
No. 3
Drive Size
7/64 Drill Bit Size
2-
1/2”
0.216”
Mounting Screw
WARNING:
Finished wall thickness
MUST NOT
exceed 1-
1/4”
WARNING:
SHOWERHEAD (
3
)
MUST
be supported
while on ROUGH VALVE (
2
)
2a
2b
3
1
5
4
1/4” Drill Bit
1
5
4
7/64
” Drill Bit
6
IMPORTANT:
SHOWERHEAD (
3
) must be installed on finished wall
•
Loosen SETSCREW (
2a
) and remove MUDGUARD
(
2b
)