background image

SH-1320W_ii_190813 

 

 

 

 

Pg 1 

 

Showerhead

 

 

SH-1320W-ZZ 

Shower & Waterfall Showerhead 

Installation Instructions 

 

 

Place  SHOWERHEAD  (

3

)  onto  ROUGH 

VALVE (

2

) and confirm that it is level

 

 

 

 

Mark hole locations on finished wall

 

 

Remove  SHOWERHEAD  (

3

)  from  ROUGH 

VALVE (

2

)

 

 

Using a ¼” drill bit, drill through TILE (

4

) and 

BACKERBOARD (

5

)

 

 

IMPORTANT:

 Do not drill into BRACE (

1

with ¼” drill bit

 

 

Using a 7/64” drill bit, drill into BRACE (

1

 

Apply  SILICONE  SEALANT  (

6

)  into  drilled 

holes and around ROUGH VALVE (

2

 

 

 

 
 
 

 
 
 

 
 
 

IMPORTANT:  Read all instructions prior to installation and provide copy of instructions to consumer. 
Operating Specifications: 

Recommended Supply Pressure: 20 to 70 psi

 

*†

 

 If water pressure exceeds 70 psi, install a Pressure-Reducing Valve (PRV). 

 
 

REMOVING MUDGUARD 

 
 

 

 

 

 

 

DRILLING HOLES IN TILE 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CALIFORNIA FAUCETS RECOMMENDS THAT ALL PLUMBING PRODUCTS BE INSTALLED  

BY A LICENSED PROFESSIONAL

 

No. 12 

Screw Size 

No. 3 

Drive Size 

7/64 Drill Bit Size 

2-

1/2”

 

0.216”

 

Mounting Screw 

WARNING: 

Finished wall thickness 

MUST NOT

 

exceed 1-

1/4”

 

WARNING: 

SHOWERHEAD  (

3

MUST

  be  supported 

while on ROUGH VALVE (

2

2a 

2b 

1/4” Drill Bit

 

7/64

” Drill Bit

 

IMPORTANT:

 SHOWERHEAD (

3

) must be installed on finished wall 

 

Loosen SETSCREW (

2a

) and remove MUDGUARD 

(

2b

)  

 

Отзывы: