background image

Pre-Delivery Instructions

Please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure 

the safe, secure, and timely installation of your new spa. The following sections are guidelines on how to prepare for 

delivery and set-up of your new spa. Specifically covered are site selection, delivery access, ground preparation, and 

electrical requirements.
Remember to carefully read the Owner’s Manual that accompanies your spa and to complete the warranty card 

within ten days of delivery. These items, along with other valuable information, are included in the Owner’s Packet 

which can be located in the equipment compartment of your spa. You will also find your serial number in the 

equipment compartment.
Watkins Wellness

™ 

reserves the right to change features, specifications, and design without notification and without 

incurring any obligation.

DATE PURCHASED:  _________________________________________________________________

DATE INSTALLED: ___________________________________________________________________

DEALER: ___________________________________________________________________________

ADDRESS: __________________________________________________________________________

TELEPHONE: _______________________________________________________________________

In most cities and counties, permits will be required for the installation of electrical circuits or the construction of 

exterior surfaces (decks and spa enclosures). In addition, some communities have adopted residential barrier codes 

which may require fencing and/or self-closing gates on the property to prevent unsupervised access to a pool (or 

spa) by children under 5 years of age. Your Caldera

®

 spa is equipped with a locking cover that meets the ASTM 

F1346-91 Standard for Safety Covers, and as a result, is usually exempt from most barrier requirements. As a 

general practice, your local Building Department will inform you of any applicable barrier requirements at the time a 

permit is obtained for the installation of an electrical circuit. Your 

CALDERA

 dealer can provide information on which 

permits may be required.

Congratulations on your decision to enjoy the finest spa available...

Welcome to the growing family of 

CALDERA

 spa owners.

Utopia 

®

 Series 

Summary of Contents for CalderaSpas Utopia Series

Page 1: ...___________________________ DEALER ____________________________________________________________________________ ADDRESS ___________________________________________________________________________ TELE...

Page 2: ...n wet Proper drainage is essential to prevent a build up of water around the spa When building a new room for the spa it is recommended that a floor drain be installed The humidity will naturally incr...

Page 3: ...ufacturer If you are interested in having a concrete slab brick surface or wood deck installed your CALDERA dealer should be able to suggest a qualified licensed contractor DELIVERY ACCESS First locat...

Page 4: ...nstallation If your spa delivery requires the use of a crane you may be required to pay for its services at the completion of the delivery SPA DIMENSIONS Model Width W Length L Height H CANTABRIA 38 9...

Page 5: ...easure your spa before making critical design or pathway decisions Configuration and location may change without notice 108 0 274 cm 38 97 cm 30 25 77 cm 102 0 259 cm 85 125 216 cm Cantabria 95 241 cm...

Page 6: ...be shimmed in any manner GENEVA and NIAGARA NOTE All dimensions are approximate measure your spa before making critical design or pathway decisions Configuration and location may change without notice...

Page 7: ...specification chart WARNING The TAHITIAN and FLORENCE must not be shimmed in any manner 84 0 213 cm 36 91 cm 28 25 72 cm 78 25 199 cm 78 25 199 cm TAHITIAN 71 180 cm 13 33 cm 84 213 cm 4 10 cm 26 75...

Page 8: ...d on a minimum 4 10 cm thick reinforced concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The RAVELLO must not be shimmed in any mann...

Page 9: ...r until panel un clips followed by the right corner until panel un clips Clip Clip Clip 3a Light connector Turn and pull to remove 3b Logo Light connector Push in side clips and pull to remove 3 Pull...

Page 10: ...nel to the subpanel The equipment pack requires a MINIMUM of 112 volts per line under load The grounding conductor must be at least 10 AWG Your electrician should mount the subpanel in the vicinity of...

Page 11: ...er GENEVA TAHITIAN NIAGARA FLORENCE RAVELLO WIRING DIAGRAMS MAIN CONTROL PANEL 220 240 VAC WIRING ACCESS DOOR See page 9 for Door Panel Removal Instructions 220 240 VAC WIRING ACCESS DRAIN POWER CONNE...

Page 12: ...only Always ensure the white neutral wire is connected to the load neutral of the 30 amp breaker Remove jumpers A from TB 1 PROVIDED WITH SPA NOTE ALL WIRING SHOULD BE COPPER Refer to NEC 250 122 tab...

Page 13: ...emove screwdriver Install Stripped end of wire into Terminal Block Push top of screwdriver away from wire Terminal Block Insert screwdriver to engage cage clamp 4 6 1 2 3 5 3 WIRE INSTALLATION FOR CON...

Page 14: ...Auxiliary panel functions Optional CALDERA Entertainment System Explain the safety features ______________ GFCI Heater high limit General spa operation maintenance orientation ______________ Water qua...

Page 15: ...___________________________________________________________________ Telephone _______________________________________________________________________________ Name _____________________________________...

Page 16: ...m 36 91 cm 100 square feet 4 000 375 gallons 1 425 liters 900 lbs 410 kg 5 080 lbs 2 315 kg 125 lbs ft 610 kg m 230 volt 30A or 20A 30A Single phase GFCI protected circuits FLORENCE 7 0 x 7 0 2 13 m x...

Reviews: