background image

 

9031125-03

 

SmartSwitch 9000

9C114 and 9C714 Chassis

Installation Guide

Summary of Contents for 9C114

Page 1: ...9031125 03 SmartSwitch 9000 9C114 and 9C714 Chassis Installation Guide ...

Page 2: ......

Page 3: ...ENTIAL DAMAGES WHATSOEVER INCLUDING BUT NOT LIMITED TO LOST PROFITS ARISING OUT OF OR RELATED TO THIS MANUAL OR THE INFORMATION CONTAINED IN IT EVEN IF CABLETRON SYSTEMS HAS BEEN ADVISED OF KNOWN OR SHOULD HAVE KNOWN THE POSSIBILITY OF SUCH DAMAGES March 1999 by Cabletron Systems Inc 35 Industrial Way Rochester NH 03867 All Rights Reserved Printed in the United States of America Order Number 90311...

Page 4: ...ch case the user will be required to correct the interference at his own expense WARNING Changes or modifications made to this device which are not expressly approved by the party responsible for compliance could void the user s authority to operate the equipment VCCI Notice This is a Class A product based on the standard of the Voluntary Control Council for Interference by Information Technology ...

Page 5: ... Environment Networking Equipment for use in a Commercial or Light Industrial Environment We the undersigned hereby declare under our sole responsibility that the equipment packaged with this notice conforms to the above directives Mr Ronald Fotino Mr J Solari ____________________________________________________ ______________________________________________________ Full Name Full Name Principal C...

Page 6: ...Notice iv ...

Page 7: ...er 1 6 Rack Mounting the Chassis 1 7 Installing a Power Supply 1 8 Attaching the Electrostatic Discharge ESD Wrist Strap 1 10 Installing the Environmental Module 1 11 Installing SmartSwitch 9000 Interface Modules 1 12 Attaching 9C614 INB Terminator Modules 1 14 Powering up the SmartSwitch 9000 1 15 Operating Specifications 1 16 Environmental Requirements 1 16 Regulatory Compliance 1 16 9C114 MMAC ...

Page 8: ...Contents vi ...

Page 9: ... Power Supply Installation Guide Local Management User s Guide In addition each interface module has a user s guide The SmartSwitch 9000 The SmartSwitch 9000 chassis is a networking platform that provides support for the configuration and operation of up to 14 Cabletron Systems SmartSwitch 9000 interface modules Features Multiple Technology Support The design of the chassis allows it to provide su...

Page 10: ...ntal Module is also hot swappable so that it can be removed for repair or replacement without causing network downtime For details refer to the SmartSwitch 9000 9C300 1 Environmental Module User s Guide The Backplane The 9C114 SmartSwitch 9000 provides six distinct backplane buses and the 9C714 provides an additional seventh bus the Cell Transfer Matrix Each bus serves a particular set of needs Th...

Page 11: ...nagement through a Telnet application The Flexible Network Buses The Flexible Network Buses FNB 1 and FNB 2 are the primary backplane buses used to connect SmartSwitch 9000 modules for shared network designs Each FNB bus operates as a dual counterrotating Fiber Distributed Data Interface FDDI ring Each FNB bus operates at 100 Mbps and consists of one primary ring and its associated secondary ring ...

Page 12: ...s have the following information ready Your Cabletron Systems service contract number A description of the failure A description of any action s already taken to resolve the problem e g changing mode switches rebooting the unit etc The serial and revision numbers of all involved Cabletron Systems products in the network A description of your network environment layout cable type etc Network load a...

Page 13: ...e modules installed in the SmartSwitch 9000 chassis The temperature of the location must be maintained between 5 and 40 C 40 and 104 F Changes in temperature greater than 10 C 18 F per hour should not occur A standard 3 prong power receptacle must be located within 6 feet of the system One circuit is recommended for each power supply The AC wiring for the receptacle must be able to supply 12 amps ...

Page 14: ...ng or rack mounted It is recommended that the SmartSwitch 9000 installation proceed in this order 1 Mount the chassis to the rack or other secure location 2 Install the power supply ies 3 Attach the Electrostatic Discharge ESD Wrist Strap 4 Install the Environmental Module 5 Install the Interface Modules 6 If necessary install the INB Terminator Modules ...

Page 15: ...itch 9000 be installed in the bottom half of the rack This will prevent the rack from being top heavy Two people may be required to lift the chassis into place The chassis is secured with twelve bolts six on each side Using the bolts provided with the rack bolt the chassis to the rack starting with the bottom holes and working up as shown in Figure 1 2 Figure 1 2 Rack Mounting the Chassis 1125_05 ...

Page 16: ...ply connector covers on the rear of the MMAC Plus chassis 5 Remove the cover Keep the cover in the event you need to remove the power supply The cover must be replaced to protect the connector 6 Hold the power supply by the handles on the top and bottom of the unit and do the following a Align the power supply so that the lip on the bottom and the hook on the top are slightly above the correspondi...

Page 17: ...stalling the 9Cx14 Chassis Figure 1 3 Installing a Power Supply 100 125v 12A 200 250v 6A 50 60 Hz POWER SUPPLY MODULE 9C214 1 100 50 0 STATUS P W R S N B Load Securing Screw Tab Securing Screw Slot on Chassis ...

Page 18: ...these modules to prevent damage from ESD Attach the ESD Wrist Strap by following the steps below 1 Attach one end of the ESD Wrist Strap to your wrist 2 Plug the other end into the ESD Wrist Strap grounding receptacle in the front lower right corner of the SmartSwitch 9000 chassis as shown in Figure 1 4 Figure 1 4 Attaching the ESD Wrist Strap ALWAYS USE ESD WRIST STRAP WHEN HANDLING MODULES ESD W...

Page 19: ...ive plastic bag Save the bag in the event the Environmental Module must be reshipped Observe all precautions to prevent damage from Electrostatic Discharge ESD 3 Remove the plastic protective cap that covers the connector on the rear of the Environmental Module 4 Examine the Environmental Module carefully checking for damage If any damage exists DO NOT install the Environmental Module Immediately ...

Page 20: ... carefully removing it from the shipping box Save the box and packing materials in the event the module must be reshipped 3 Remove the Interface Module from the plastic bag Save the bag in the event the Interface Module must be reshipped Observe all precautions to prevent damage from Electrostatic Discharge ESD 4 Examine the Interface Module carefully checking for damage If any damage exists DO NO...

Page 21: ...s in straight and properly engages the backplane connectors When installing the Interface Module ensure that the circuit card is between the card guides as shown in Figure 1 6 Check both the upper and lower tracks 6 If you are installing additional Interface Modules repeat steps 1 5 Figure 1 6 Installing SmartSwitch 9000 Interface Modules 2031_02 Circuit Card Card Guides Metal Back Panel Plastic L...

Page 22: ...the module must be reshipped 2 Hold the INB Terminator Module by the handle and line up the screws that extend from the module with the screw holes in one of the INB Termination Connectors on the rear of the SmartSwitch 9000 chassis Figure 1 7 3 Push the INB Terminator Module in gently until the frame of the module touches the frame of the chassis 4 Tighten the screws on the INB Terminator Module ...

Page 23: ... cord into an AC receptacle Turn on the power supply using the switch located near the power socket 3 The power supply uses a soft start feature and does a pre power diagnostic check Outputs become enabled within 5 seconds of turning the power on 4 Check that the PWR and SMB LEDs on the power supply are green If the LEDs are any color other than green refer to the Power Supply User s Guide 100 125...

Page 24: ...ng this may take up to 20 seconds If an Interface Module s SMB and BOK LEDs are not green refer to the User s Guide for that Interface Module Operating Specifications Environmental Requirements Operating Temperature 5 C to 40 C 41 F to 104 F Storage Temperature 30 C to 90 C 22 F to 194 F Operating Relative Humidity 5 to 90 non condensing Regulatory Compliance Safety This equipment meets the safety...

Page 25: ...Weight Unit 19 96 kilograms 44 pounds Shipping 24 95 kilograms 55 pounds 9C300 1 Environmental Module Dimensions 12 7 H x 43 2 W x 44 5 D centimeters 5 H x 17 W x 17 5 D inches Weight Unit 6 5 kilograms 14 pounds Shipping 7 7 kilograms 17 pounds 9C214 1 Power Supply Dimensions 61 H x 19 1 W x 14 D centimeters 24 H x 7 5 W x 5 5 D inches Weight Unit 7 7 kilograms 17 pounds Shipping 9 07 kilograms 2...

Page 26: ...ling the 9Cx14 Chassis 1 18 9C614 INB Terminator Module Dimensions 21 59 H x 2 22 W x 14 92 D centimeters 8 5 H x 0 875 W x 5 875 D inches Weight Unit 0 45 kilograms 1 pound Shipping 0 68 kilograms 1 5 pounds ...

Reviews: