background image

TECHNICAL

BULLETIN

1 OBJECTIVE

The objective of this technical bulletin is to inform members of additional considerations when

testing and maintaining 

fi

re and smoke dampers. It should be used alongside BESA publications:

DW/145: Guide to Good Practice for the Installation of Fire and Smoke Dampers; DW/144: Sheet

Metal Ductwork; TR/19: Internal Cleanliness of Ventilation systems and SFG 20: The de

fi

nitive  

standard for planned maintenance.

TB/001

Figure 1: Example of

fusible link 

operated 

fi

re damper

2 TECHNICAL INFORMATION

2.1 STANDARDS

British Standard 9999:2008 - Code of Practice for Fire Safety in the Design, Management & Use of

Buildings, publishes industry standards for the de

fi

nition, maintenance and testing of Fire dampers. It

states that all Fire dampers should meet the criteria of 

fi

re resistance for a stated period of time and

that:

“Any grille or opening through the enclosure for ventilation purposes should be protected by a 

fi

re damper”

“All 

fi

re dampers should be tested by a competent person at regular intervals not exceeding two years, and to be repaired

or replaced immediately if found to be faulty. Spring-operated 

fi

re dampers should be tested annually and 

fi

re dampers

situated in dust-laden and similar atmospheres should be tested much more frequently, at periods suited to the 

degree of pollution.”

In addition; guidelines have been introduced by the department of health that encourage regular

testing of 

fi

re dampers. In Part B of Health Technical Memorandum 03-01, 

fi

re dampers are required to

be tested and maintained annually. Inspection and functional testing of smoke and 

fi

re dampers

should be speci

fi

ed by the manufacturer.

2.2 SPRING OPERATED FUSIBLE LINK FIRE AND SMOKE DAMPERS 

Spring Operated Fusible Link Fire Dampers are designed to "Fail" at 72° C. The fusible link releases the

spring loaded 

fi

re damper to contain the 

fi

re within the ductwork space. This ensures that the 

fi

re does

not spread through the ductwork ventilation system. The di

ff

erent types of fusible link are:

Cassette Unit

Rigid Bar

Chain Link

If a fusible link has failed it cannot be repaired and must be reported to client. 

2.3 INSTALLATION, MAINTENANCE AND TESTING

All volume dampers are set up during commissioning and should not normally be subject to further

adjustment unless modi

fi

cations are made to the ductwork distribution system. If it is essential to

move the damper for maintenance purposes extreme care should be taken to ensure that the damper

is returned to the position as set when commissioned. In the event of a ductwork modi

fi

cation, the

system should then be re-commissioned. 

Installation: To enable the Fire Dampers to be tested and reset access panels need to be installed. Access panels shall

be quick release insulated neoprene sealed panels, all manufactured and installed to BESA speci

fi

cation DW/144. 

Required location of access panel, along with party responsible for provision of the panel is prescribed in Table 3 of

BESA publication TR/19.

FIRE AND SMOKE DAMPER 

MAINTENANCE

1

|

2

Reviews:

Related manuals for TB/001