background image

ESSENCIA DROP-IN

 

 

ESSENCIA OVAL 7236 & DESIGN 7438

INSTALLATION INSTRUCTIONS 

ADDENDUM

 to 

ESSENCIA -  INSTALLATION 

 

INSTRUCTIONS

*

 

IMPORTANT INFORMATION 

FOR THE INSTALLER AND THE OWNER

* This document should always be accompanied by the

  ESSENCIA - INSTALLATION  INSTRUCTIONS.

 

TO BE KEP

T B

Y THE O

WNER

 

Summary of Contents for ESSENCIA OVAL 7236

Page 1: ...7438 INSTALLATION INSTRUCTIONS ADDENDUM to ESSENCIA INSTALLATION INSTRUCTIONS IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER This document should always be accompanied by the ESSENCIA INSTALLA...

Page 2: ...N DROP IN MODELS INSTALLATION INSTRUCTIONS TABLE OF CONTENT IMPORTANT SAFETY INSTRUCTIONS 1 PARTS TOOLS 3 SITE PREPARATION 5 INSTALLATION DROP IN WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DES...

Page 3: ...e drugs or alcohol before or during the use of a Hydro thermo massage bathtub equipped with a heater Use this unit only for its intended purposes or as described in this manual Use only accessories or...

Page 4: ...90 C Canada only for permanently connected units A green colored terminal or a wire connector marked g gr ground or grounding is provided within the terminal compartment not applicable if unit suppli...

Page 5: ...ng nut 1 C Strainer 1 D Rubber seal 1 E PVC Wired drain shoe 1 F PVC Piping 1 1 2 x2 1 G PVC Tee Connector 1 1 2 F F 1 DESCRIPTION QTY H Plated drain clicker 1 I Strainer 1 J Rubber seal 1 K Brass dra...

Page 6: ...ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS B C D A PARTS TOOLS REQUIRED STANDARD PARTS THERMOMASSEUR DESCRIPTION QTY A Turbine 1 B MiaPlus Control Design 7438 1 C MiaMulti Control Ov...

Page 7: ...erneath the bath can support 1500 lb 680 kg The bath may sit directly on the floor The bathtub can also sit on a concrete bed In that case it is recommended to isolate the concrete between two plastic...

Page 8: ...653 ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS PLUMBING INTALLATION TEMPLATES FLOOR LAYOUT FOR PIPES AND ACCESS ESSENCIA OVAL 7236 ESSENCIA DESIGN 7438 DROP IN INSTALLATION WITH REMO...

Page 9: ...ent applications or are protected by patents ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS 1 PLUMBING ESSENCIA OVAL 7236 Assembly of the waste overflow DROP IN INSTALLATION WITH REMOTE...

Page 10: ...l 2017 BainUltra Inc All rights reserved 45200653 ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS DROP IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DESIGN 7438 1 PLU...

Page 11: ...installation template DROP IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DESIGN 7438 Box Structure Installation Template IF NEEDED make an opening of sufficient dimension in the...

Page 12: ...1 16 0 2cm considering the thickness of the glue of the finishing Adjust the height of the bath to the floor if necessary The bath is molded with a slope towards the drain If the bathtub is levelled a...

Page 13: ...rawn on the installation template at 1 2 5 cm from the outside edge of the bath area Keep an access to perform electrical plumbing connections Keep minimum 22 x18 55cmx46cm access to perform electrica...

Page 14: ...bath during installation Connect the drain Perform a leak test before completing the box installation Once the bath is placed on the floor it is recommended to leave a clearance of 1 16 0 2cm between...

Page 15: ...OVAL 7236 DESIGN 7438 5 ELECTRONIC CONTROL INSTALLATION MIAPLUS DESIGN 7438 MIAMULTI OVAL 7236 PAGE 15 6 REMOTE MOUNTING OF TURBINE PAGE16 7 REMOTE MOUNTING OF TURBINE AIR PIPE THERMOMASSEUR PAGE 17...

Page 16: ...MODELS INSTALLATION INSTRUCTIONS DROP IN INSTALLATION WITH FACTORY INSTALLED TURBINE ESSENCIA OVAL 7236 A Turbine B WarmTouchShell C Chromatherapy LED D MiaPlus E MiaMulti F AromaCloud C A D E F B FO...

Page 17: ...h the ground and its clearance with the opening on top of the box Use shims if necessary and attach them to the ground WARNING Check the spacing from the bottom of the deck to the top of the plywood p...

Page 18: ...e box opening for the final installation of the bath on the floor A ESSENCIA DESIGN 7438 DRAIN CONNECTION B DECK OF THE BATH CLEARANCE 4 10cm minimum WARNING Leave the plastic film on the bath and pla...

Page 19: ...er in the bath during installation Cut the bath contour on the support panel according to the EXTERIOR contour line drawn on the installation template AND LEAVE an additional 1 4 0 6cm of clearance Ch...

Page 20: ...on the top panel following the UNDERMOUNT line of the installation template Apply a bead of silicone on the contour of the bath to make sure the bottom of the box is sealed 5 ELECTRONIC CONTROL INSTA...

Reviews: