background image

www.arrowsheds.com

Customer Service:

1-800-851-1085     or

[email protected]

 BUILDING DIMENSIONS

6’ x 4’

Nominal Size

Gloves must be worn 

at all times to reduce 

risk of injury!

    Size rounded off to the nearest foot

* See Inside for Detailed Safety Information.

Owner’s Manual
& Assembly Guide

01BL

716400816

Base 

Size

74” x 45 1/4”

188,0 cm x 114,9 cm

 For proper base construction see page 12

Exterior Dimensions

(Roof Edge to Roof Edge)

    Width          Depth         Height

Interior Dimensions

(Wall to Wall)

    Width          Depth         Height

Door

Opening

    Width          Height

 Approx.

Size

Storage 

Area

6’ x 4’

21 Sq. Ft.  113 Cu. Ft.

76 1/2”

47”

67 3/4”

71 1/4”

42 1/2”

66 9/16”

32”

60”

1,8 m x 1,1 m

2,0 m2         3,2 m3

194,3 cm

119,4 cm

172,1 cm

181,0 cm

108,0 cm

169,1 cm

81,3 cm

152,4 cm

Model No.   EPA64  

 

Summary of Contents for EPA64

Page 1: ...al Assembly Guide 01BL 716400816 Base Size 74 x 45 1 4 188 0 cm x 114 9 cm For proper base construction see page 12 Exterior Dimensions Roof Edge to Roof Edge Width Depth Height Interior Dimensions Wa...

Page 2: ...f of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Do NOT attempt to assemble your building on a windy day The large panels can catch t...

Page 3: ...windy day Be careful on wet or muddy ground Use Teamwork Two or more people are required to assemble your building One person can hold the parts or panels in place while the other person fastens them...

Page 4: ...ollapses Note Most instruction manuals provide a warning note at the beginning of the installation step for corner panels stating that the remainder of the building assembly requires multiple hours an...

Page 5: ...s square Also try loosening the roof beams to give more play and exibility Non alignment can also occur if your building is not level You can raise corners and shim under them to make it level Check t...

Page 6: ...your shed s attractive appearance for years Q How do I take care of dents in my shed A Proper selection of shed size including a suf cient door opening width and proper placement of your shed should...

Page 7: ...382 Lower Door Guide 4 11 66183L Left Roof Trim Cap 2 12 66183R Right Roof Trim Cap 2 Key No Part No Part Description Qty List 3 2 Phillips The fasteners used in each step are shown actual size at the...

Page 8: ...Right and Left Doors 2 12 10563 Wall Panel Side 2 13 9369 Door Jamb 2 14 9389 Front Corner Panel 2 15 10561 Rear Corner Panel 2 16 9396 Door Track 1 17 10565 Rear Wall Angle 1 18 9925 Rear Wall Channe...

Page 9: ...ASSEMBLY BY KEY NO 9 09BL 15 15 10 10 12 12 14 14 22 21 21 20 13 13 18 16 19 20 24 17 2 2...

Page 10: ...ASSEMBLY BY KEY NO 10 10BL 7 6 23 17 3 4 5 1 11 11 9 9 8 8 8 8 Doors Roof...

Page 11: ...Floor Frame Attach Header Gables and Roof Beam Install Roof Panel Roof Trim and Corner Cap Install Doors 11BL Shed is now complete Install Corner Panels Side Angles and Rear Angles Install Wall Panel...

Page 12: ...instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6 cm 61 0 cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized...

Page 13: ...Y 8 SS 66769 66769 The door track header assembly supports the sliding doors and reinforces the front wall It is made up of 2 pieces Door Slide 4 To remove or install Door Slides Remove Doors from Sli...

Page 14: ...erly The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to complete the assembly today A partially ass...

Page 15: ...561 9389 10561 10563 Step 3 Corners Wall Panels 10563 Wall Panel 2 Attach wall panels to the sides as shown 3 The wall panels come in two widths Each panel has a crimped rib on one side The rib should...

Page 16: ...ide Wall Channel 2 10545 Side Wall Angle 2 10564 QTY 2 SS QTY 38 SS The upper leg of the side wall angles must face the outside of the building Door Track 1 10545 10564 Door Track Header Assembly 1056...

Page 17: ...u will need for this page Fasten the wall panels at the top and bottom with screws 1 2 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs as before Rear Front QTY...

Page 18: ...and acorn nuts as shown Push a plug into hole at center of jamb closest to door opening 1 Fasten the top of the door jamb to the door track with two screws Do the same for the bottom into frame 2 Hex...

Page 19: ...or this page 10569 Roof Beam 1 10569 The dimension stated below measures from the end of the angle towards the front of the building Fasten the roof beam small holes on top to the side wall angle with...

Page 20: ...rib UNDER the uncrimped rib Crimped Rib Uncrimped Rib Be sure to carefully follow the Roof Panel Placement Order Diagram on this page If Roof Beam holes do not line up with Roof Panel holes shift the...

Page 21: ...nel 10558 at the right side and fasten to the header roof beam and rear wall angle using screws as shown 80011 Left Roof Panel 1 10558 Right Roof Panel 1 10558 1 Install the left roof panel 80011 on t...

Page 22: ...h a bolt and nut 1 Narrow roof panel crimped rib is overlapped by wide rib of adjacent panel where possible You will need for this page FASTEN TO REAR WALL ANGLE WITH SCREWS FASTEN TO NEXT PANEL WITH...

Page 23: ...gable at the right end of the completed roof by tucking top edge inside the rib of the right roof panel and sliding the lower leg inbetween the leg of the side wall angle and top edge of the wall pan...

Page 24: ...roof panel overlap 1 A single screw fastens both trim pieces at the overlap 24BL Roof Trim 2 80002 80002 QTY 4 SS QTY 4 SS Using your thumb and index nger overbend the bottom ange of the roof trim at...

Page 25: ...n the opposite side of the door and insert a bolt and nut 25BL SB 3 Insert a second bolt in the door handle and tighten both bolts QTY 10 SB Horiz Brace 4 10499 2 10476 Door Handle Brace 2 6657 Handle...

Page 26: ...at the holes in the door line up with the holes in the door slides 26BL 4 Repeat steps 1 through 3 for the left door The holes in the door slides allow you to adjust the doors Place the door in the mi...

Page 27: ...mmended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instructions Anchoring into Wood Post Use 1 4 6 mm Wood Screws There are 1 4 6 mm dia holes provided in th...

Page 28: ...t does appear on your shed we recommend treating those areas as soon as possible following the paint supplier of your choice instructions Our customer service department can provide the paint tinting...

Page 29: ...eat for garage basement or the back of any door Fits all Arrow storage buildings ROOF STRENGTHENING heavy snow load KITS Extra roof beams and gable braces designed for added protection against heavy s...

Page 30: ...ASSEMBLY NOTES 46A 30...

Page 31: ...ASSEMBLY NOTES 46A 31...

Page 32: ...ASSEMBLY NOTES 46A 32...

Reviews: