background image

INSTALLATION INSTRUCTIONS

Division of LWO Corp. / P.O. Box 17125 / 3841 North Columbia Boulevard / Portland, Oregon

503-286-5372 / fax 1-503-286-4092 /  www.arboria.com         

PLEASE READ COMPLETELY BEFORE YOU BEGIN ASSEMBLING

CHECK CARTON FOR THESE CONTENTS

445.35.86

     

1 of 4

 

   

updated 

04/26/05

ITEMS YOU WILL NEED

INTRODUCTION

R

Nantucket 

Arbor

1).  Lattice Side Frames (2)

2).  Header Boards (2)

3).  Rafter Boards (4)

4).  Cap Boards (8)

5).  Lattice Triangles (2)

Hardware
•  1” screws (4)
•  4” screws (8)
•  3/4” screws (8)
•  2 1/2” screws (28)
•  Arbor Anchor Stake Kit

• Philips 

screwdriver

• Power 

drill/screwdriver

•  Stool or short ladder

If you plan to paint:

If you wish to stain or paint your arbor we 
recommend that you do so before assembly, 
it makes the job easier, with better results. 
Be careful not to permit paint to puddle in 
grooves in the arches or upper frame, and do 
not cover up guide marks on rafters.

Work area:

Select an area close to where the arbor will be fi nally placed. While the assembled unit is not very 
heavy, it is awkward to move far and requires two people to do so easily.

The assembly are should be relatively fl at and open, at least 8’ x 6’. A lawn, driveway or wide path 
will be satisfactory.

It is a good idea to lay out the arbor shipping box on your work surface to protect the arbor from 
nicks and scratches.

(2)

(3)

(4)

(5)

(1)

Reviews: