background image

Da Vinci Billiard Assembly Instructions

:  

Provided by American Heritage Billiards

 

 

 

 

 

 

 

**Please read entire Assembly guide prior to building the Da Vinci pool table.

 

 

 

Prior to Assembly, Check that there is 1 x assembled base, 1 x Rail Box, 1 x Side/End Blinds 

Box, 1 x Accessory kit, and 1 set of framed slate inside the cabinet 

Summary of Contents for Da Vinci Billiard

Page 1: ...rican Heritage Billiards Please read entire Assembly guide prior to building the Da Vinci pool table Prior to Assembly Check that there is 1 x assembled base 1 x Rail Box 1 x Side End Blinds Box 1 x Accessory kit and 1 set of framed slate inside the cabinet ...

Page 2: ...r the legs to adjust if needed Step 4A Locate the center piece of framed slate and position it on the cross beam assembly so that it is centered to both the length and width of the assembly you must be very accurate with placement Pre drill hole through slate screw hole using a 3 16 drill bit Vacuum out debris and secure using slate screws pictured below figure 1 A Continue with same process with ...

Page 3: ...aple Once cloth is completely stapled cut pocket openings by cutting small vertical incisions in cloth to relax the fabric so it can be stretched and stapled around opening Finally make X style slits in cloth where rail bolts will go through the slate holes see photo Step 6 Slate bed will ultimately look like this when covered with cloth Step 7 Prep the rails and blinds on the top of the table mak...

Page 4: ......

Page 5: ......

Page 6: ......

Page 7: ...tely sure to use only the enclosed blind screws when securing the blinds to each rail incorrect screw length will cause permanent damage to all blinds Step 9 Follow this same process for the end rails and blinds Step 10 For both long side rail blind assemblies thread the threaded rods into all rail inserts being sure to hand tighten before proceeding to the next step Threaded Rod ...

Page 8: ...ed washer and nut Dome of washer faces down Step 12 Slide the end rail blind assembly onto the table making sure both corners align with the side rail blind assemblies Repeat this step for both ends of the table Strep 13 Once all four corners are flush attach the provided cleats to both the end blind and side blind as shown below to ensure that all four cornes stay flush during the following steps...

Page 9: ...ay To install the pockets squeeze the top of the pocket and bring it up through the pocket opening from the bottom Be sure not to push back the pockets so they are flush against the rail the first priority is to ensure they line up with the felt near the playing surface Peel back the paper to reveal the sticky side of the velcro on the backside of the Pocket to secure the Pocket to the Rail Please...

Reviews: