background image

Quick Start 

Guide

Overview

This quick start describes how to install, configure, and troubleshoot the NetVanta 1570-24-370W, Layer 3 Lite PoE+ Switch. Figures 1 and 2 show the 

Front and Rear Panel layouts of the switch. 

“Installing the Switch” 

on page 2

“Connecting to the Switch” 

on page 5

“Power Over Ethernet (PoE+)” 

on page 6

“Understanding the Status LEDs” 

on page 6

“Using the MODE Button” 

on page 7

“Troubleshooting the Switch” 

on page 8

Figure 1. Front Panel Layout

Figure 2. Rear Panel Layout

WARNING!

f

Read all warnings, cautions, notes and installation instructions before installing or servicing this equipment.

NetVanta 1570-24-370W

SYSTEM

LNK/ACT/SPD

PoE

CONSOLE

USB

MODE/RESET

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

LINK/ACT/SPD

Mode LED

SYS

LED

CONSOLE

Port

10/100/1000

RJ-45 with PoE+

1G/10G

SFP+ Ports

PoE

Mode LED

MODE

Button

Port Status

LEDs

AC Line: 100-240V 50-60Hz

AC Line: 100-240V 50-60Hz

Power Connection

f

     

WARNING!

f

     

CAUTION!

g

     NOTE

WARNING indicates a hazard which, if 

not avoided, could result in death, injury 

or serious property damage.

CAUTION indicates a hazard which, if not 

avoided, could result in service interruption, 

damage to the equipment, or minor property 

damage.

NOTES inform the user of additional, but 

important, information or features.

NetVanta 1570-24-370W

Layer 3 Lite PoE+ Switch

August 2022

617101574PF1-13A

P/N: 17101574PF1

Summary of Contents for NetVanta 1570-24-370W

Page 1: ...this equipment NetVanta 1570 24 370W SYSTEM LNK ACT SPD PoE CONSOLE USB MODE RESET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 LINK ACT SPD Mode LED SYS LED CONSOLE Port...

Page 2: ...of the chassis Insert the provided screws and tighten them with a screwdriver to secure the brackets Figure 3 Attaching Brackets to the Switch 2 Position the chassis in the stationary equipment rack A...

Page 3: ...e 5 Attaching the Rubber Feet Supplying Power to the Switch To connect the AC power cord to the switch complete the following steps 1 Connect the AC power cord to the AC power receptacle on the rear p...

Page 4: ...st comply with the national state and local electrical code requirements as applicable The AC branch circuit overcurrent protection must be a fuse or circuit breaker rated 125 VAC 20 Amps maximum or 2...

Page 5: ...Select OK to change the PC s IP address 3 Power up the switch to be initially configured and wait until it has finished its start up processes 4 Connect the PC to any port on the switch using a stand...

Page 6: ...EEE 802 3af PoE and IEEE 802 3at PoE standards By default the PoE switch discovers and provides power to IEEE compliant PDs it also supports legacy PDs The total PoE budget for the switch is 370W Each...

Page 7: ...no active network cable connected or has not established a link to connected device Oth erwise the port may have been disabled through the switch user interface SFP Ports Green On The port is enabled...

Page 8: ...derstand the abnormal state e g exceeding operating temperature range and take correspond ing actions to resolve Port Status LED is OFF when the LINK ACT SPD LED is LIT The port is not connected or th...

Page 9: ...des provide additional information for this ADTRAN product available online at https supportcommunity adtran com Configuring the CLI in ASE Configuring QoS in ASE Configuring Layer 2 Services in ASE C...

Reviews: