background image

1

EasyGateway

®

 

Operating Instructions

Summary of Contents for EasyGateway EG400-HE

Page 1: ...1 EasyGateway Operating Instructions...

Page 2: ...nproblematic access to your systems be it machines equipment controls locking systems and many more at any time and anywhere Operation mainte nance or support of these targets become as easy as surfin...

Page 3: ...06 Delivery scope 08 Device connections 10 Step 1 Installation 12 Step 2 Antenna SIM card 14 Step 3 Power connection terminal covers 16 Step 4 Network RJ45 18 Step 5 Operation and status display 20 St...

Page 4: ...00 VAC to ground must be connected via voltage transformers Conductors made up of individual wires must be provided with cable end sleeves Consult the network administrator before connecting the EasyG...

Page 5: ...EDGE dual Band UMTS HSPA or LTE SIM Plug in and or soldering SIM SIM Multiplexer Local IP interface Fast Ethernet 10 100 Mbps auto MDIX RJ45 shielded 2 status LEDs Local serial interfaces RS485 RS422...

Page 6: ...6 2 1 Delivery Scope Terminal cover EasyGateway...

Page 7: ...7 EN 5 4 Network cable RJ45 SIM card optional SMA antenna 3...

Page 8: ...8 Device connections 12 11 10 9 13 7 6 5 4 3 8 1 2...

Page 9: ...9 EN 1 8 9 2 3 10 4 11 5 12 6 7 13 SMA antenna socket LED status display Reset Micro SD card slot SIM card slot Ethernet RJ45 USB Host Start up button RS485 CS CS LED Pulse output I O Power connection...

Page 10: ...10 Step 1 2 1 74 35 mm...

Page 11: ...of the holes in the housing bottom as reference DIN snap rail The EasyGateway is snapped on a 35 mm DIN rail When installing the unit on the DIN rail verify that the locking hook is securely attached...

Page 12: ...12 Step 2 1 2...

Page 13: ...utside the cabinet as the recep tion conditions in closed cabinets will not fulfil the requirements Directly attachable antennas and antennas connected via a cable are available Accessories see separa...

Page 14: ...Supply voltages that do not conform to the specifi cations indicated on the type plate may result in malfunction and destruction of the device The connecting lines for the supply voltage must be secu...

Page 15: ...the latter has been positioned correctly Protective earth PE Neutral conductor N Phase L Terminal covers Attach the transparent terminal cover to carry out the start up operation The terminal cover c...

Page 16: ...16 Step 4 1 2...

Page 17: ...X interface which means that straight and crossover Ethernet cables shielded or unshielded can be used Additional interfaces Please refer to page 24 for information on other interfaces Green LED Displ...

Page 18: ...18 5 6 Step 5 1 3 2 4...

Page 19: ...configuration has been loaded and functions correctly Network LED Network green The Ethernet interface functions correctly Start Reset Upon delivery the initial start up for the EasyGateway has alread...

Page 20: ...Network are flashing green This puts the Gateway into configuration mode The configuration page can now be reached with your Browser via http 10 10 10 10 Save once the settings have been completed Th...

Page 21: ...y Ethernet interface Eth0 Nr 6 page 8 DHCP configuration If DHCP is enabled there are 3 configuration possibilities for Enable keep DHCP up Disabled A DHCP request is only sent at start up of the Easy...

Page 22: ...ig LED Config red reception level good 60 80 db Network LED Network red reception level very good better than 60 db Reset Press the Reset button to boot the EasyGateway The EasyGateway will remain in...

Page 23: ...23 EN...

Page 24: ...24 Other interfaces Pin 1 Pin 6...

Page 25: ...rfaces must be loaded on the EasyGateway Availability on request Connector and pin assignment The connection is 2 wired via an RJ12 jack Pin assignment Conductor A Pin 2 conductor B Pin 3 Since a bus...

Page 26: ...26 Notes...

Page 27: ...27 EN...

Page 28: ...Aartesys AG Silbergasse 32 CH 2502 Biel Bienne www aartesys com Tel 41 32 327 35 35 E Mail info aartesys ch Support E Mail helpdesk aartesys ch Hotline 41 32 327 35 34 1809...

Reviews: