background image

Horizontal Mounting 

 

 

 

In the Box:

 

 

RS Add-On Holder 

 

Installation Hardware 

 

Add-On Mounting Bolts 
 

 

Tools Required: 

 

Drill 

 

1/4” 

Drill Bit 

 

1/2” Socket and Ratchet

 

 

Tape Measure 

 

Level 

 

3/8” Allen

 Wrench

 

 

 

 

Installation 

 

Begin by finding wall location to install. Unit requires two studs for horizontal 

mounting and one stud for vertical mounting. 20” 

minimum clearance required 

beyond both ends of unit. 

 

Use level and tape to mark and drill 1/4” pilot holes in wall for mounting. Horizontal 

mounting will require four holes. Vertical mounting will require two holes. 

 

Use supplied lags and washers to install unit. 2” lags used for horizontal mounting. 

 

4 1/2

” lags used for vertical mounting. Spacers used for vertical mounting. Lags 

should be tightened firmly. 

 

 

 

 

 

 

 

 

 

 

Vertical Mounting 

Spacers to install on backside 
of RS Add-On Holder. 

RS Add-On Holder 

Reviews: