Chapter 9 Fault
NetAtlas EPON Manager User’s Guide
120
4
In the Timeout field, accept the default or specify a connection timeout period (in
seconds).
5
Click Apply to start the loopback test.
Figure 77
Fault > Loopback Test
6
A screen displays showing the test result. Click Close to exit the screen.
Figure 78
Fault > Loopback: Result
9.3 Ping and TraceRoute Test
You can use the Ping screen to test connection from the selected device to a
specified IP address.
Summary of Contents for NetAtlas
Page 2: ......
Page 8: ...Contents Overview NetAtlas EPON Manager User s Guide 8 ...
Page 16: ...Table of Contents NetAtlas EPON Manager User s Guide 16 ...
Page 17: ...17 PART I Introduction Introducing the EMS 19 Main Screen 23 ...
Page 18: ...18 ...
Page 42: ...Chapter 2 Main Screen NetAtlas EPON Manager User s Guide 42 ...
Page 44: ...44 ...
Page 88: ...Chapter 6 Template NetAtlas EPON Manager User s Guide 88 ...
Page 98: ...Chapter 7 Provisioning NetAtlas EPON Manager User s Guide 98 ...
Page 114: ...Chapter 8 Performance NetAtlas EPON Manager User s Guide 114 ...
Page 148: ...Chapter 11 Tools NetAtlas EPON Manager User s Guide 148 ...
Page 150: ...150 ...
Page 152: ...Chapter 12 OLT Configuration Overview NetAtlas EPON Manager User s Guide 152 ...
Page 198: ...Chapter 14 Switch Configuration NetAtlas EPON Manager User s Guide 198 ...
Page 216: ...Chapter 15 Multicast Configuration NetAtlas EPON Manager User s Guide 216 ...
Page 238: ...Chapter 17 RMON Configuration NetAtlas EPON Manager User s Guide 238 ...
Page 248: ...Chapter 18 EPON Configuration NetAtlas EPON Manager User s Guide 248 ...
Page 290: ...Chapter 19 EPON Profile Configuration NetAtlas EPON Manager User s Guide 290 ...
Page 314: ...314 ...
Page 316: ...Appendix A Alarm Types and Causes NetAtlas EPON Manager User s Guide 316 ...
Page 334: ...Appendix B SOAP Schema NetAtlas EPON Manager User s Guide 334 ...