Zakład Wytwórczy Aparatów Elektrycznych Sp. z o.o.
4
1. TRANSPORT
1.1 Unpacking and inspection
Immediately after receiving the disconnector it should checked the delivery compliance with the shipping spec-
ification. Then should be checked whether the disconnector has not been mechanically damaged during trans-
port and the data on the nameplate match the order.
1.2. Storage and transport
Disconnector poles are transported in assembled condition. During the unloading and assembly process, the
disconnector poles should be lifted using transport belts, placed in the manner shown in the following graphic.
During transport, disconnector poles are placed on wooden beams, which should be removed immediately
before placing the pole on the supporting structure, unscrewing the four screws with a wrench size 13.