Z400BZ
INSTALLATION INSTRUCTIONS
Zurn Industries, LLC
|
Specification Drainage Operation
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In Canada
|
Zurn Industries Limited
3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292
www.zurn.com
Rev.
A
Date:
04/06/2018
C.N. No.
139849
Form No. FD86
®
Dimensional Data (inches and [mm]) are Subject to Manufacturing Tolerances and Change Without Notice
Page
1 of 2
Step 1
Loosen and remove the three #8-32 x 1/4 [6] lg. flat head
strainer screws A that secure the strainer B to the
frame. D
Step 2
Remove the strainer. B
Step 3
Loosen but do not remove the three #8-32 x 3/4 [19] lg.
flat head screws that secure the frame D to the
head. F
Step 4
Using a 1/8” allen wrench, insert the allen wrench
through any of the six guide holes in the frame D
to engage the #10-32 x 3/4 [19] lgflat head leveling
screws. E
Step 5
Turn the allen wrench counter-clockwise to loosen and
raise the leveling screw E underneath the frame. D
Step 6
Repeat with all six leveling screws E as necessary.
The leveling screws E can be used to raise the entire
frame D a set height or to adjust the frame D
positioning to make level with the finished floor.
Maximum adjustment height of the frame D is 3/8” [10mm].
WARNING
: Cancer and Reproductive Harm -
www.P65Warnings.ca.gov
ADVERTENCIA:
Cáncer y daño reproductivo -
www.P65Warnings.ca.gov
AVERTISSEMENT:
Cancer et effets néfastes sur la reproduction -
www.P65Warnings.ca.gov