ZURN TEMP-GARD III Z7300 Series Operation / Installation Instruction Download Page 1

‰

‰

‰

‰

‰

Operation 

‰

‰

‰

‰

‰

 Installation 

‰

‰

‰

‰

‰

 Maintenance Instructions 

‰

‰

‰

‰

‰

 Replacement Kits

Pressure Balancing Shower/
Tub & Shower Valve
Z7300 Series

TEMP-GARD III

FOR OPTIMUM VALVE PERFORMANCE, BALANCE SUPPLY PRESSURES TO LESS THAN 5 PSI PRESSURE
DIFFERENTIAL BETWEEN HOT AND COLD WATER SUPPLIES.

2. Always install valve with mud guard (23) so that the indicated surface on mud guard is flush with finished wall.

The hole in the wall should be 4” in diameter.

3. If valve is to be used for a shower only, wrap threads on tub plug (24) with teflon tape and install plug into tub

port on shower valve.

4. When the final outer wall is finished remove mud guard and open both supply stops on valve by turning

counter clockwise.

5. Loosen and remove escutcheon (19) from valve. Carefully remove cartridge (10) from valve by holding

cartridge as close to the valve body (1) as possible and wiggling back and forth until cartridge comes out of
the valve. Place thumb and finger on gray part of cartridge to remove it, as shown in Figure 4.

6. With the cartridges removed from all valves in the system, turn on water supply and flush the system of any

debris. If the water coming out of the valve while flushing is going behind finished wall, a hose bib flushing out
kit (RK7300-20HB) may be used to allow the water to be directed to a drain by attaching a garden hose to
valve.

7. If hot and cold supply inlets are reversed simply remove cartridge and reinstall with cartridge flipped

180

o

. The handle adaptor (12) will need to be readjusted. To adjust handle adaptor remove and turn

180

o

. Handle should always turn through cold, then hot. Reinstall cartridge and tighten escutcheon to

150 in lbs. The system will need to be flushed again before installing shower heads.

8. To adjust temperature limit stop (11), turn valve to desired hottest temperature, remove temperature

limit stop (11) turn clockwise and reinstall so that the white protrusion on cartridge is touching the red
protrusion on the temperature limit stop.

9. After all flushing is done install shower heads and check system for leaks.

INSTALLATION OF TEMP-GARD III SHOWER VALVE
(Refer to page 4 for part no.)

AquaSpec

®

 is a registered trademark

of Zurn Industries, LLC
©2010 Zurn Industries, LLC

1. Install rough piping
and valve body as
shown. 

Do not use

PEX or CPVC CTS piping
from valve to tub spout, as
the reduced ID results in
too much back pressure for
valve to function
properly

. When facing

valve, HOT "H" is on
left and COLD "C" is on right.
Tub port “T” should face down
and shower port “S” should
face upward. The ears on the
valve at the 5 o’clock and
11 o’clock positions may
be used to attach the valve to
framing of wall if necessary.

WARNING: Caution should be
taken when heating valve for
sweat connections to avoid dam-
aging internal rubber and plastic
components in valve.

FIGURE 1

®

Form #

 CF1024

Date:

 12/16/11      SHT 1 OF 4

C.N. No.

 128417

Rev.

  G

Summary of Contents for TEMP-GARD III Z7300 Series

Page 1: ...lve 7 If hot and cold supply inlets are reversed simply remove cartridge and reinstall with cartridge flipped 180o The handle adaptor 12 will need to be readjusted To adjust handle adaptor remove and turn 180o Handle should always turn through cold then hot Reinstall cartridge and tighten escutcheon to 150 in lbs The system will need to be flushed again before installing shower heads 8 To adjust t...

Page 2: ...checks If valve is going to be installed in Thin Wall Application such as a fiberglass or panel wall it is recommended that an optional wall flange RK7300 WF be used This wall flange is used to sandwich the wall between the valve body and cover plate OPERATION The main handle of the Temp Gard III valve is for temperature control only To turn valve on the handle is turned counterclockwise through t...

Page 3: ...s are open Valve will not operate unless both HOT and COLD water inlets have pressure Water volume from valve is Pressure balancing piston housed in Remove and service cartridge as inconsistent during operation cartridge 10 assembly is blocked described in steps 1 through 6 from free movement by foreign of the MAINTENANCE and SERVICE matter section Valve delivers an insufficient quantity of Hot or...

Page 4: ...p Plunger 4 Spring 5 Stem O Ring 6 Service Stop Roll Pin 7 Service Stop Stem 8 Retainer O Ring 9 Service Stop Retainer RK7300 WF WALL FLANGE KIT OPTIONAL ITEM NO 14 Wall Flange RK7300 LH LEVER HANDLE KIT ITEM NO 21 Handle 22 Set Screw RK7300 11AE 001 COVER SCREWS KIT 2 PER ITEM NO 18 Cover Plate Screw 3 RK7300 EXT EXTENSION KIT OPTIONAL ITEM NO 26 Escutcheon Extension 27 Set Screw 28 Stem Extensio...

Reviews: