Chapter 6 Installing Cable
F
IGURE
37 100 Ω T1 C
ABLE
A
PPEARANCE
Steps
1. Lead the 100 Ω T1 cable through a slot on the top into the
cabinet.
2. Lay out the 100 Ω T1 cable along the vertical cable tray at the
right side of cabinet to the B2 connector (E1/T1 cable connec-
tor) of data cable.
Refer to
for the instruction of data cable.
3. Connect the DB44 connector of 100 Ω T1 cable to the B2 in-
terface (E1/T1 cable interface) of data cable through the
SA
module.
E
ND OF STEPS
.
Result
After installation completed, the appearance of 120 Ω E1 cable is
as shown in
Installing Abis Interface
Ethernet Cable
Prerequisite
�
The transmission between BTS and BSC is based on the IP
bearer network.
�
Install the CC module.
Context
Both ends of Ethernet cable are crimped with the RJ45 connector,
as shown in
Confidential and Proprietary Information of ZTE CORPORATION