![Zte ZXSDR BS8800 C200 Installation Manual Download Page 57](http://html1.mh-extra.com/html/zte/zxsdr-bs8800-c200/zxsdr-bs8800-c200_installation-manual_940276057.webp)
Chapter 6 Installing Cable
F
IGURE
33 D
ATA
C
ABLE
I
NSTALLATION
C
OMPLETION
1.
Ground terminal
2.
E1/T1 cable
3.
RS232/RS485
4.
Dry contact input/output
Postrequisite
Continue to install the E1/T1, RS232/RS485, dry contact in-
put/output cables.
Installing 75Ω E1 Cable
Prerequisite
Install the SA module and its panel connection cable.
Context
Abis
-interface 75 Ω E1 cable is the transmission cable between
ZXSDR BS8800 C200 and
, transmitting the interface message
between ZXSDR BS8800 C200 and
.
The appearance of 75 Ω E1 cable is as shown in
. End a
of the cable is a DB44 straight connector. There are two types of
cable: in
, the above cable supports eight E1 cables and
the following supports four E1 cables.
Confidential and Proprietary Information of ZTE CORPORATION
49
Summary of Contents for ZXSDR BS8800 C200
Page 6: ...List of Glossary 159 ...
Page 9: ......