ZXG10 iBSC Hardware Installation Guide
9.4 Installation Requirement
1.
Arrangement of computer cabinet, monitor, and mouse shall be uniform and
consistent.
2.
Labels on computer display and cabinet shall marks the purpose of this machine.
3.
Connecting bolt between peripheral devices (monitor and printer) and computer cab-
inet shall be tighten.
4.
All cables at the back of computer shall be arranged in tidy and bundled, can’t mutually
bounded, with suitable margin.
9-4
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Summary of Contents for ZXG10 iBSC
Page 8: ...II ...
Page 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...