Hardware Development Guide of Module Product
All Rights reserved, No Spreading abroad without Permission of ZTE
11
ZTE MG2618
(Instrument Network,
GPS sleep)
PGSM
,
62
,
PCL10
157.13
120.65
145.4
mA
PGSM
,
62
,
PCL19
94.41
32.71
82.01
mA
DCS
,
698
,
PCL0
195.42
147.47
180.7
mA
DCS
,
698
,
PCL5
146.32
113.48
135.2
mA
DCS
,
698
,
PCL15
87.68
70.53
79.08
mA
Note:
As the GPS can’t work indep
endently, when the module sleep in the condition of GPS working,
in fact , the module is in the state of part dormant, and the part related to GPS is still working.
3.3
Power-on/off timing sequence
The timing sequence of module shows entire process of power-on/off.
Figure 3
–
1 Power-on/off timing sequence
3.4
Reliability Test
The reliability test of module includes the items as follows: High/low temperature operation, high/low
temperature storage, thermal shock, alternating temperature humidity, etc. The test results must conform to
the industrial requirements. Module testing environment of temperature is shown as the Table below.
Table 3
–
3 Module testing environment of temperature