
26 / 152
Swell nail description
①Press down the center cylinder with 4# inner hexagon or other tools, you can hear a sound or the center cylinder moves
axially by 2mm;
②Pry open the gap with a blade, nail or carving knife, etc. and remove it; if space permits, you can reach it Push out from the
back;
③Pinch the outer ring with two fingers, and push the center cylinder up to the initial position;
④Pinch the center cylinder with two fingers to install the swell nails to the installation position;
⑤The outer ring is attached to the connected parts; if not attached Check whether it is misaligned;
⑥Press the center cylinder with your fingers or other tools, and you can hear a sound or the top of the center cylinder is almost
flush with the top surface of the outer ring, indicating that the assembly is in place.
Summary of Contents for ZT350T-D
Page 1: ...1 152 ZT350T D Maintenance Manual 2022 11 24...
Page 50: ...50 152 D350 Braking system component diagram...
Page 88: ...88 152 Electrical schematic diagram of EFI system...
Page 124: ...124 152 Exploded view of front fork components Directional exploded view...
Page 125: ...125 152 Front fork exploded view...