background image

MEYERTECH LIMITED 

Office Block One 

Southlink Business Park 

Oldham OL4 1DE 

 

Sales:  +44 (0)161 628 8406 

Email: [email protected] 

http://www.meyertech.co.uk 

To obtain the optimum performance from your ZVK-
77D follow the installation guidelines below.

  

WARNING!! 

THIS EQUIPMENT MAY CONTAIN HAZARDOUS 

VOLTAGES. 

THIS EQUIPMENT MUST BE EARTHED TO PREVENT 

FIRE OR SHOCK HAZARD. 

DO NOT EXPOSE THIS EQUIPMENT TO RAIN OR 

MOISTURE.

 

Unpack the ZVK-77D and check you have  

• 

ZVK-77D KEYBOARD 

• 

12V DC PSU and POWER LEAD 

• 

ZoneVu NETWORK LEAD 

• 

INSTALLATION GUIDE 

• 

USER and CONFIGURATION GUIDE 

Site the ZVK-77D in a suitable location paying particular 
attention to current Health and Safety recommendations 
concerning the use of keyboards. 
 
Power-up the ZVK-77D by connecting it to the 12V DC 
PSU. 
 
BASIC CONFIGURATION 
 
The ZVK-77D requires configuration of the following 
parameters before use. 
 

• 

MAC address 

• 

Line termination setting 

• 

Operational Mode setting 

 
To carry out this basic configuration LOG-ON to the 
keyboard at Engineering Level (if you are uncertain how 
to do this please read the relevant section in the ZVK-77D  
User and Configuration Guide) select Program / Setup 
and then select Network Setup. Now enter the relevant 
MAC, Line term. and Mode parameters for your system. 
  
 

 
 
 

MAC Address

  

 
The Module Access code or MAC is only required if the 
ZVK-77D is to be connected to a system network. If 
operated in Standalone mode it is irrelevant. 
 

Line Termination

  

 
Where the ZVK-77D is connected on a system network 
will determine whether termination should be on or off. 
Generally only one piece of equipment should be 
terminated on any particular network. If operated in 
Standalone mode termination should be switched on. 
 

Mode

 

 
The Mode of operation of the ZVK-77D should be set to 
Network if it is to be connected to a ZoneVu system 
containing a Video Matrix or Site Controller. Otherwise it 
should be set to Standalone. 
 
 
CONNECTING THE ZVK-77D 
 
On the inside pages of this guide you will find a rear panel 
layout of the ZVK-77D and a table showing connection 
details to other ZoneVu equipment.  

 

 

 

 

 

 

 

ZVK-77D 

INSTALLATION GUIDE 

  

  

 

 

SUPPORT LINES 

 

TEL: + 44 (0) 161 628 8406

 

2

2

 

FAX: + 44 (0) 161 628 9811

 

:

 

E-mail: [email protected]

 

 

Reviews: