All-in-One
Outdoor Energy Storage Cabinet
Quick Installation Guide
Model: C215L-A-EU
Page 1: ...All in One Outdoor Energy Storage Cabinet Quick Installation Guide Model C215L A EU...
Page 2: ...utions 4 Location Selection 5 Foundation Requirement 6 Transportation Requirement 7 Cabinet Reinforcement 8 Electrical Connection Requirement 9 Communication Connection Requirement 10 Other Requiremen...
Page 3: ...g at height safety helmet shall be well fastened safety belt shall be used properly working tools shall be firmly attached and wear non slip shoes 4 It is required to wear mask in case of heavy dust o...
Page 4: ...rved in front of the cabinet for door opening The floor shall be flat with 1499 1444 leveled area four M12 30 anchor bolts shall be driven into the ground for installation of the cabinet Reinforcement...
Page 5: ...y the included angle formed by the lifting rope will be greater than 60 The lifting rope shall have a load bearing capacity of 2 5T lifting and lowering operations shall be carried out steady The fork...
Page 6: ...the wiring screw tightening torque is 18 22N M PE connects to the grounding copper strip the wiring screw tightening torque is 8 10 N M For external communication of EMU it is recommended to use Ultr...
Page 7: ...ENERGY FOR LIFE...