Cables Installation and Fixing
For the outlets of the concealed cables, please refer to the drawing indicating the mounting holes.
The input voltage for this swing barrier turnstile is
AC100-120V/200-240V
and its master and slave
are connected by a
3-core cable (signal)
and a
2-core cable (power)
. When installing the swing
barrier turnstile, the user only needs to connect it to the corresponding ports. Note that the PVC
conduits are laid
100mm
under the ground, with the height of the exposed part not exceeding
100mm
. In addition, the conduit outlet is bent back to prevent ingress of water into the conduit.
SBTL 300 series installation holes and cabling positions is shown in Figure 2-2:
Figure 2-2
Mark the screw hole at the centre of the stand, and the edge of the chassis base on the ground
according to the sizes as shown on the Figure 2-2. Use a hammer drill to make M12 screw holes and
then install the screws. Place the swing barrier turnstile according to the sizes and positions as
shown in the figure before installation and fixing. Connect the online cables and perform the power-
on test. If the test is OK, tighten the screws. It is recommended that a warning line be marked on the
ground after installing the device, so as to prompt the pedestrian to stand behind the warning line
when swiping the card. As shown in Figure 2-3:
100.00
190.00
707.00
190.00
100.00
1287.00
300.00
50.00
300.00
φ25PVC pipe
100.00
Expansion Screw
Devices