2
Unpacking and Testing the Tripod Turnstile
2.1
Arm Installation
In order to prevent the arm from damaging during transportation, the arm will not be initially installed to
the devices.
Installation procedure
Put the arm kit into the hole of cabinet; make sure the screw holes match with mechanism core, then
tighten 3 hex screws, as shown in Figure 2-1.
Figure 2-1
2.2
Power-on Test before Installation
1. Please make sure that the power requirements are strictly met to avoid permanent damages to the
unit. Input voltage: AC 100~120V /200~240V.
Note:
The tripod turnstile must be connected to the ground (earth).
2. Power on and wait 30s for the tripod turnstile to finish the self-check program.
3. Lift the arms manually, as shown in Figure 2-2.
4. Check whether the tripod turnstile and the LED indicators work properly.
If there is any problem, please contact the supplier.