10
EN
1. Installation (seat frame installation)
Installation of the base group and main frame
Insert the support base under the main frame into the socket of the base group verti-
cally (Fig.1). Note: It should be inserted symmetrically on both sides to ensure that the
main frame and the base group are installed firmly (Fig.2). Press the button behind the
main frame (Fig.3) to separate the main frame from the base group.
Model: BY055
Product Name: Baby swing
Package Specification: 505x195x670mm
Weight Load: 0-20lbs (9kgs)
Main Materials: ABS, steel, polyester
PRODUCT INFORMATION
PACKAGE LIST
HOW TO INSTALL
1. Base group × 1
2. Main frame × 1
3. Seat frame × 1
4. Mosquito net × 1
5. Remote control × 1
6. Power adapter × 1 (rated frequency:
50-60Hz, rated voltage: 6V)
7. User manual
Timing
Switch
Swing +
Swing -
档位
音�
定�
1.
5.
6.
7.
2.
3.
4.
Summary of Contents for PAOLO BY055D
Page 59: ...59 4 1 2 3 4 5 1 2...
Page 60: ...60 2 7 GR 6 1 2 1 2 7...
Page 61: ...61 1 8 8 2...
Page 62: ...62 GR 8 5 5 40 9 9 3...
Page 63: ...63 8 1 8 0 8 0 8 1 1 4 1 2 USB 3 110 V...
Page 64: ...64 GR 5 8 5 5 40 8 0 PVC 3V 1 2...
Page 65: ...65 3 4 0 20 5 6 7 8 9 10 11 9 kg 12 13 14 15 16 17 18 19 20 21 22 23 24 25...
Page 75: ...75 4 5 1 2 3 4 5 O 1 2...
Page 76: ...76 2 7 BG 6 1 2 1 2 7...
Page 77: ...77 1 8 8 2...
Page 78: ...78 BG 8 5 40 9 3...
Page 79: ...79 8 1 8 8 0 1 4 1 2 USB 3 110 V...
Page 80: ...80 BG 5 8 5 40 8 0 PVC 3V...
Page 81: ...81 1 2 3 4 5 6 9 7 8 9 10 11 12 13 9 kg 14 15 16 17 18 19 20 21 22 23 24 25...