![ZIGOR SOLAR HIT3C Operating Manual Download Page 68](http://html1.mh-extra.com/html/zigor/solar-hit3c/solar-hit3c_operating-manual_3707156068.webp)
Operating Manual
ZIGOR SOLAR HIT3C
8
© ZIGOR
3
INSTALLATION
3.1 Receiving the material
Extract all the packaging material and visually examine the unit and accessories for possible damage during
transport. Notify the seller about any damage.
WARNING
Ensure that the weight of the unit is within the maximum load limits (kg) of the tools used in
order to handle it and the supports used to secure it in place. Review weight details in the
specifications of the ZIGOR SOLAR HIT3C.
If it is necessary to move the ZIGOR SOLAR HIT3C, use a forklift truck or pallet truck.
NEVER USE A CRANE
AND LIFTING RINGS
to move the ZIGOR SOLAR HIT3C as its great weight does not allow this.
Check that the material delivered corresponds to the delivery note. To do this, check the manufacturer's data plate
situated on the front or inside the door of the ZIGOR SOLAR HIT3C.
NO CLAIMS WILL BE ACCEPTED IF, 24 HOURS FOLLOWING THE DELIVERY OF THE GOODS,
NO NOTIFICATION OF RECEPTION OF MATERIAL IN BAD CONDITION HAS BEEN RECEIVED
AND IF THIS CIRCUMSTANCE IS NOT NOTIFIED TO THE FORWARDING AGENT ON THE
CORRESPONDING DELIVERY NOTE AT THE TIME OF DELIVERY.
3.2 Site and installation conditions
The ZIGOR SOLAR HIT3C system uses forced ventilation for refrigeration and therefore the unit must be installed
in a place where there is no obstruction of the ventilation airflow for which it has been designed.
Fig. 3-1 Recommended ventilation