3/8" X 6.50"
HEX HEAD BOLT
3/8" FLAT WASHER
Before Step 3 can be completed, two hole must be dug 40"
apart on center from previously dug holes at a depth of 30" -
36". Make each hole approximately 10" wide in diameter. These
holes will be used to construct end section of the Zig Zag
Message Center. Refer to hole layout at end of instructions for
more detail.
Step 3:
Place End Section of Zig Zag Message Center
into post hole and attach to Middle Section of
Zig Zag Message Center as shown. Use the
supplied 3/8" x 6.50" Hex Head Bolt. Level
where necessary and fill hole with filler.
Repeat step for second end section.
Components required for Step 3:
Hardware required for Step 3:
(3) 3/8" x 6.50" Hex Head Bolt
(3) 3/8" Flat Washer