ZIEHL-ABEGG ECblue BASIC-MODBUS Quick Start Manual Download Page 4

2

Safety instructions

This chapter contains instructions to prevent personal injury and property damage. These instructions 
do not lay claim to completeness. In case of questions and problems, please consult our company 
technicians.

Information

Mounting, electrical connection, and start-up operation may only be carried out by an electrical 
specialist in accordance with electrotechnical regulations (e.g. EN 50110 or EN 60204)!

Danger due to electric current

It is generally forbidden to carry out work on electrical live parts. Protection class of the device when 
open is IP00! It is possible to touch hazardous voltages directly.

The safe isolation from the supply must be checked using a 

two-pole

 voltage detector.   

The rotor is not protected against indirect contact neither by supplementary or reinforced insulation 
nor by connection to safety-earth in accordance with EN 60204-1, therefore the motor/fan must be 
installed so that it is not touchable.

When the motor runs independently due to air 

owing through or if it continues to run down after 

being turned off, dangerous voltages of over 50 V can arise on the motor internal connections 
through operation of the generator.

Even after disconnecting the mains voltage, life-threatening charges can appear between the 
protective ground 

PE

 and the mains connection. 

The protective earth is conducting high discharge currents (dependent on the switching frequency, 
current-source voltage and motor capacity). Earthing in compliance with EN speci

cations shall 

therefore be observed even for testing and trial conditions (EN 50 178, Art. 5.2.11). Without 
earthing, dangerous voltages can be present on the motor housing. 

Waiting period at least 3 minutes!

Through use of capacitors, danger of death exists even after switching off the device through 
directly touching the energized parts or due to parts that have become energized due to faults.

The controller housing may only be removed or opened when the power line has been switched off 
and a period of three minutes has elapsed since switching it off.

Attention!

During commissioning, unexpected and hazardous conditions can arise in the entire installation due 
to defective adjustments, defective components or incorrect electrical connections. Remove all 
persons and objects from the hazardous area.

Before 

rst-time start-up, check the following:

1. Installation and electrical connection have been properly completed?
2. Has any leftover installation material and other foreign material been removed from the fan 

area?

3. That safety devices -if necessary-  are mounted (EN ISO 13857)?
4. The impeller is out of reach?
5. Are the condensation water drains holes open or respectively closed according to the suitable 

installation position?

6. Connection data complies with the speci

cations on the rating plate?

Start-up may only begin when all safety instructions have been veri

ed and any hazards have been 

ruled out.

Check for quiet, low vibration operation. Strong vibrations due to erratic operation (unbalanced), 
e.g. caused by transportation damage or improper use, can lead to failure.  

A-rated sound power levels of over 80 dB(A) are possible, see product catalogue. 

Check for mechanical vibrations after installation into the system. If the tolerances according to 
ISO 14694 are exceeded, it is possible to exclude certain speed ranges (see Motor Setup). 

Check the direction of rotation (see rotation direction arrow on the fan blade, impeller base plate 
or on the fan housing). 

Maintenance work may only be carried out by suitably quali

ed personnel.

"

Before working on the fan, this must be disconnected from the power supply and secured against 
switching back on!

"

No maintenance work at running fan!

"

Wear safety shoes and gloves for handling!

"

Please observe the safety regulations and the worker

´

s protection rules by all maintenance and 

service work (EN 50 110, IEC 364).

Quick Start Guide 

ECblue BASIC-MODBUS, ECblue BASIC

Safety instructions

L-BAL-F078-GB 2024 Index 005

Part.-No. 00706648-GB

4/32

Summary of Contents for ECblue BASIC-MODBUS

Page 1: ...lue BASIC Motor sizes D 116 G 152 EC fans and motors with highest ef ciency Quick Start Guide Keep for reference Detailed Assembly instructions on www ziehl abegg com L BAL F078 GB 2024 Index 005 Part...

Page 2: ...of centrifugal fans 9 4 4 Mounting the motor 9 5 Electrical installation 10 5 1 Version with connection cables 10 5 2 Version without connection cables 11 5 2 1 Assembly notes for cable glands 13 5 3...

Page 3: ...th the quality mark see rating plate please note the related speci cations depending on the application location 1 2 Structure of the short operating instructions Attention This Quick Start Guide cont...

Page 4: ...The controller housing may only be removed or opened when the power line has been switched off and a period of three minutes has elapsed since switching it off Attention During commissioning unexpect...

Page 5: ...er use Improper use reasonably foreseeable misuse Conveyance of aggressive and explosive gaseous media Use in areas at risk of explosion for conveying gas mist vapours or mixtures of the above Transfe...

Page 6: ...le ambient temperature Corrosion is possible at the cutting edges on sendzimir galvanised parts 3 2 Functional description ECblue stands for EC fans and motors with maximum ef ciency Highly ef cient e...

Page 7: ...dly way in accordance with the respective national legal stipulations Separate the materials by type and in an environmentally friendly way If necessary commission a specialist company with the waste...

Page 8: ...class 8 8 or A2 70 stainless steel to EN ISO 4014 and provide with suitable screw locking Permissible tightening torques MA Motor size D D G Thread size M6 M8 M10 Special application with 5 pitch Prop...

Page 9: ...m Screw penetration 1 5 x d 1 5 x d When using screws with different friction values or strength classes different tightening torques may be necessary 4 4 Mounting the motor Motors design MK Fastening...

Page 10: ...ng and connection assignment of the connecting leads may vary depending on the version Read the following chapter Version without connection cables for a new connection to the terminals in the termina...

Page 11: ...at delivery Remove plastic fastener if necessary and insert enclosed cable glands entry points that are not used must remain sealed 3 Insert and connect lines correctly note the respective connection...

Page 12: ...section rigid min 0 2 mm2 0 2 mm2 0 2 mm2 Conductor cross section rigid max 10 mm2 1 5 mm2 1 5 mm2 Conductor cross section exible min 0 2 mm2 0 25 mm2 0 2 mm2 Conductor cross section exible max 6 mm2...

Page 13: ...n the collar to the speci ed torque with a suitable torque wrench Insert the cable through the cable gland into the housing Fit the union nut by hand and tighten slightly Tighten the union nut to the...

Page 14: ...grease dust or other impurities Use of a damaged cable is not allowed Two lines may only be fed through one cable gland with the sealing insert for two lines When using the seal insert for two cables...

Page 15: ...ary module with universal control function or for integration into different networks X With AM MODBUS auxiliary module possible 5 4 Connection diagrams Note the following information and select the c...

Page 16: ...ng Addressing MODBUS RS 485 PORT 1 PORT 2 3 0 1 Aus Ein Off On 1 Line voltage see rating plate 2 Relay output K1 for fault reporting factory function max contact load AC 250 V 2 A During operation the...

Page 17: ...Ein Off On 1 Line voltage see rating plate 2 Relay output K1 for fault reporting factory function max contact load AC 250 V 2 A During operation the relay is energised i e the connections 13 and 14 a...

Page 18: ...losed according to the suitable installation position 6 Connection data complies with the speci cations on the rating plate During start up check the following 1 Check the direction of rotation see ro...

Page 19: ...vices from version 11 onwards In a hard wired system wireless communication is primarily designed to provide a second interface for communicating with the device e g for con guration and diagnostics T...

Page 20: ...accessible position and make sure that clear assignment to the relevant product is possible This enables you to guarantee that even if the rating plate is covered up e g due to the installation situat...

Page 21: ...ssary open the Settings area with the gear wheel symbol 3 Switch on the line voltage to the fan frequency converter in compliance with the safety instruc tions 4 Activate the Bluetooth connection on t...

Page 22: ...ctivate it if necessary 6 ZAset then starts searching for devices in range and adds compatible devices to a list 7 Brie y tap the desired device in the list to select it ZAset Mobile then immediately...

Page 23: ...omatically opens to link with the serial number If a binding already exists you have to enter the PIN see second stage The serial number can either be entered manually by reading it off and entering i...

Page 24: ...to prevent unauthorised access 9 If required enter a name of your choice alias Example 01_ECblue Quick Start Guide ECblue BASIC MODBUS ECblue BASIC AM STICK WB L BAL F078 GB 2024 Index 005 Part No 007...

Page 25: ...tion the colour of the Bluetooth symbol changes from red to green 11 Actual values on Dashboard when connection is established successfully Quick Start Guide ECblue BASIC MODBUS ECblue BASIC AM STICK...

Page 26: ...address identi cation etc 4 Error history 5 Parameter 6 back to Dashboard 7 Analysis 8 Speed control by variable Information Please observe the additional information in the app documentation and the...

Page 27: ...ediate circuit overvoltage 9 x 1 Cooling down period power module 10 x 0 Communication fault 11 x 0 Error motor start 12 x 0 Line voltage too low 13 x 0 Line voltage too high 14 x 0 Error peak current...

Page 28: ...nt temperature valid for the respective fan Operation below 25 C as well as partial load operation for refrigeration applications is only possible with special bearings for refrigeration applications...

Page 29: ...ic current in accordance with EN 61000 3 2 are guaranteed For 3 types According to EN 61000 3 2 see Assembly instructions Electrical installation EMC compatible installation Harmonics current for 3 ty...

Page 30: ...electrical equipment of machines Part 1 General requirements EN ISO 12100 2010 Safety of machinery General principles for design Risk assessment and risk reduction EN ISO 13857 2008 Safety of machine...

Page 31: ...he EC Machinery Directive K nzelsau 03 09 2018 location date of issue ZIEHL ABEGG SE Dr W Angelis Technical Director Air Movement Division name function ZIEHL ABEGG SE Dr D Kappel Deputy Head of Elect...

Page 32: ...tp www ziehl abegg com 9 4 Service information If you have any technical questions while commissioning or regarding malfunctions please contact our technical support for control systems ventilation te...

Reviews: