OWNER'S MANUAL
Instructions for Assembly
Requires two people and takes 2-3 hours for lnstallation.
Quick & Easy Assembly
Ridge Reinforced Walls
Available in Various Sizes
NE-0608
Page 1: ...Metal Garden Shed OWNER S MANUAL Instructions for Assembly Requires two people and takes 2 3 hours for lnstallation Quick Easy Assembly Ridge Reinforced Walls Available in Various Sizes NE 0608...
Page 2: ...o lawn directly Also the ground will get muddy during rainy days If a concrete pad is made it is important that this slopes towards the edges to prevent water ingress Time must be allowed for any conc...
Page 3: ...L 4R 5 6 7 9 10L 10R 11 12 13 14L 14R 15L 15R 16 17 18 19 20 21L 21R PART NO Qty 1800mm 1158mm 681mm 681mm 1750mm 1750mm 1045mm 1090mm 1094mm 1788mm 981mm 981mm 1799mm 356mm 1750mm 306mm 306mm 172mm 1...
Page 4: ...F GD GB GC GE 4 4 4 2 GS 4 F1 F2 F3 S3 PART NO Qty P1 P3 P4 P5 P6 PART NO Qty 1740X570mm PARTS LIST PANEL HARDWARE KIT D1 2 13 2 2 2 2 385 8 70 400 1750mm 1207mm 1207mm 1207mm 1207mm F4 12 S2 360 P7 2...
Page 5: ...1 ASSEMBLY OVERVIEW ALL WALL PANELS 5 3L 3R 1 P1 P1 P1 P1 P1 P1 P1 P1 P8 P8 P1 P1 P1 P1 P1 13 13 13 13 4L 4R 23 23 22 22 2 2 9 9...
Page 6: ...GD 18 18 18 GB P6 P7 P4 P3 P5 P5 P7 P4 P3 P6 21R 21L 11 21L 21R 7 7 6 17 17 17 17 19 19 10L 10R 10R 10L GC GS GS GC GC GC GS GS GE GE GF GF 20 20 15R 15L 15L 15R 12 12 14R 14L 14L 14R GF GF ASSEMBLY O...
Page 7: ...2 2 F1 F1 F1 F1 F1x 4 2 x 2 PRE ASSEMBLY 1 FLOOR FRAMES...
Page 8: ...GB F2 D1 18 18 18 F2 F2 F2 F1 18 18 F1 F2 F2 GB GD F2 18 x 6 D1x 2 GBx 2 F1x 12 F2x 22 GDx 4 PRE ASSEMBLY 4 DOORS PRE ASSEMBLY...
Page 9: ...21L x 2 21R x 2 14L x 2 14R x 2 F2x 14 15L x 2 15R x 2 GF x 4 12 x 2 PRE ASSEMBLY 5 GABLE ASSEMBLY 12 14R 14L 12 F2 21L F2 15L GF F1 21L F2 15L GF F1 F1x 4...
Page 10: ...F2x 12 PRE ASSEMBLY 6 ROOF FRAMING 11R 21R 15R F2 15L 11L F2 21L F2 12 F2 14R 16 x 1 11 x 2...
Page 11: ...2 3L 3R 5 1 Wen diagonal measurements are equal the frame is square 2 The Floor Frame must be BOTH square AND level or the holes will not line up properly F1x 12 STEP1 FLOOR ASSEMBLY 1 x 2 3Lx 1 3Rx 1...
Page 12: ...r shown above Rest the Panel on the Floor Frame and the holes in the Panel should line up with the holes in the Frame F1 F1 F1 F1 P1 x 6 13x 4 F1x 56 S3 x 58 S3 22x 2 STEP2 CORNER FRAME CORNER PANELS...
Page 13: ...F1x 28 S3 x 36 20x 2 G2 x 4 7 x 2 F1 7 G2 STEP3 WALL FRAMING GABLE F1 F1 F1 9 20 20 7 9 7 F4x 8 F4 9 x 2...
Page 14: ...P1 x 7 4L x 1 4R x 1 6 x 1 F1x 85 S3 x 95 P1 P1 STEP4 WALL PANEL DOOR ROLLER ASSEMBLY P1 P1 P1 P1 P1 P1 P1 F1 S3 4R 4L F4 S3 F4x 6 F2x 2 F2...
Page 15: ...F1 F1 P6 P5 S3 P4 P7 P5 P3 STEP5 ALL THE ROOF PANELS P3 x 4 P4 x 2 P5 x 2 P6 x 2 F1x 88 S3 x 88 P7 x 2 P5 P3 P7 P6 P6 P3 P7 P5 P4 P4...
Page 16: ...F1 P6 F1 GE 10R 10L 17 19 10R 17 10L 10L GS GS 10R 10R 10L x 2 10Rx 2 F1x 32 S3 x 32 17 x 4 GCx 4 GE x 2 GS x 4 STEP6 ROOF TRIM P7 P3...
Page 17: ...F3 18 7 G2 F3x 8 STEP7 DOOR ASSEMBLY...
Page 18: ...W1 x 2 W2 x 2 W3 x 4 W4 x 6 F1x 2 W2 1 W3 W1 W1 W2 STEP8 METAL FOUNDATION ASSEMBLY 1 1 1 1 5 2 2 W1 W1 W2 W2 W3 W3 W3 W3 W4 W4 W4 W4 W4 W4 3L 3L W4 W3...