background image

Phone

: (

07

)

31236148

350

-

00108-03

Beijing Hua Xin Liu He Investment (Australia) Pty Ltd.

Brisbane

 

Office

32

 

Cr

Banyo

QLD 4014

ockford

 

Street

Phone

: (

07

31236148

Fax

: (

07

32664758

Email

salesstaff

@

zeusappollosolar

.

com

.

au

Perth

 

Office

1

/

87

 

President

 

Street

Welshpool

WA 6106

Phone

: (

08

65556518

Fax

: (

08

94704103

Email

sales

@

zeusappollosolar

.

com

.

au

USER

 

MANUAL

Z21

 

Series

Summary of Contents for Z21 Series

Page 1: ...Ltd Brisbane Office 32 Cr Banyo QLD 4014 ockford Street Phone 07 31236148 Fax 07 32664758 Email salesstaff zeusappollosolar com au Perth Office 1 87 President Street Welshpool WA 6106 Phone 08 655565...

Page 2: ...Selecting The Mounting Location 3 4 Mounting 03 03 04 05 16 01 17 18 19 21 4 1 AC Output Connection 4 2 PV Connection 4 3 Battery Connection 4 4 RS 485 Connection 4 5 EzMeter Connection 4 6 EzConverte...

Page 3: ...d over or slung 2 2 Safety Installation maintenance and connection of inverters must be performed by qualified personnel in compliance with local electrical standards wiring rules and the requirements...

Page 4: ...nection Guide 1 Wi Fi Connection Configuration Warranty card 1 Instruction of Fast Installation 3 3 Selecting The Mounting Location For the accessibility of monitoring the LED lights and possible main...

Page 5: ...C terminal Refer to Figure 4 1 2 7 Compress the terminal head using an appropriate tool and screw down the screw cap slightly Refer to Figure 4 1 3 Figure 4 1 4 8 Insert AC terminals into the correspo...

Page 6: ...ator 4 Disconnect the waterproof ring from the insulator 5 Put the cable through the components in this order screw cap waterproof ring insulator battery cover and battery terminal Refer to Figure 4 3...

Page 7: ...Positive terminal Negative terminal Figure 4 3 6 Figure 4 3 7 Hexagon head screw Pan head screw 4 5 EzMeter Connection The EzMeter may detect the current magnitude and direction to control the working...

Page 8: ...It will be required to configure the EzConverter if a lithium battery is used in the system to enable communication with the battery BMS Communication between the inverter and the EzConverter is via a...

Page 9: ...igure 4 8 1 Open USB cover Touch switch 4 10 System Connection Diagram Note Not all overcurrent protection devices are included in diagram this diagram is for Australia Switch Board Grid Back Up Zeus...

Page 10: ...NECTED NOT ACTIVE ON GRID IS ACTIVE AND CONNECTED BLINK GRID IS ACTIVE BUT NOT CONNECTED OFF GRID IS NOT ACTIVE ON CONSUMING ENERGY FROM GRID BUYING BLINK 1 SUPPLYING ENERGY TO GRID ZEROING BLINK 2 SU...

Page 11: ...Relay Check Failure DC Injection High EEPROM R W Failure SPI Failure DC Bus High AC HCT Failure GFCI Failure Vac Failure Battery Over Temperature Battery Under Temperature Battery Cell Voltage Differ...

Page 12: ...efficiency Euro efficiency MPPT adaptation efficiency Max inverter backfeed current to the array A IEC62109 1 2 AS3100 IEC62040 1 30 28 516 440 184mm 516 440 184mm Protection Residual current monitori...

Page 13: ...e ambient air temperature is 20 50 C relative humidity range is 4 to 100 applied to PD3 Indoor unconditioned the ambient air temperature is 20 50 C relative humidity range is 5 to 95 applied to PD3 In...

Reviews: