Z/ZL 1500/2000-135/155/175
Installation
23
www.zepro.com
4.2.1 Adjusting the tilt angle
IMPORTANT
!
Make no adjustments to the cylinders before installing
them on the platform. The tilt cylinders are factory preset.
1. Loosen the rubber bellows at the bottom where
they are secured with hose clips.
2. Run tilt-up until both tilt cylinders are fully
raised.
NOTE!
Always make adjustments with full hydraulic pres
-
sure in the tilt cylinders.
3. Undo the three locking screws on the cylinder
mounted on the platform, Figure 36
.
Figure 34.
Check the position in rela
-
tion to the rear beam of the vehicle
Vehicle floor level
A
Max. 40 mm, Min. 38 mm
Figure 35.
The platform underhang (A), varies accord
-
ing to platform type, and this should be taken into
consideration when installing the upper edge seal.
Locking screws, 3 pcs.
Out
In
Figure 36.
Adjusting the tilt angle
Type
Steel
Aluminium
A (mm)
70
81
5. Test the lift by carefully raising it to the vehicle
floor level and tilting it to the vertical position.
Check the position in relation to the rear beam
and side posts of the vehicle. See Figure 34 and
Figure 35.
Summary of Contents for Z 1500-135
Page 2: ......