![ZEP SOLAR ZS Comp Installation Manual Download Page 30](http://html1.mh-extra.com/html/zep-solar/zs-comp/zs-comp_installation-manual_3425258030.webp)
© 2012/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0351-001 Rev B
Page 26
ZS COMP INSTALLATION MANUAL FOR COMPOSITION SHINGLE ROOFS - U.S.
Step 3:
Secure and Align Front-Row Leveling Feet
Secure Leveling Foot to Comp Mount
3a
Up-roof
Secure outer Leveling Feet first.
String line
Tongue
Key
Attach String Line to Outer Leveling Feet
3b
Secure the Leveling Foot to the Comp
Mount using machine screw provided.
Leveling Foot position can be adjusted in several ways:
•
Alternate mounting hole on Comp Mount
•
Slotted bolt hole on Leveling foot base
•
Leveling Foot base can be angled to avoid an Interlock or other
hardware.
Refer to the Engineering Certification Letter for details. (Ideally,
front-row Leveling Feet should aim for the up-roof center hole,
center the slot over the hole, and use a straight alignment.)
Ensure proper orientation of the
Rockit. The Tongue side should face
up-roof.
360 degrees of freedom
Leveling Foot Flexibility
ideal