MECHANISM - VCR
VR168 - 923-03485
4-7
D35E COMBO - SERVICING
Opener Lid
Arm
Assembly
Pinch
Base Assembly P4
Arm T/up
Lever T/up
(A)
(B)
(C)
(C)
(H13)
(B)
(H13)
Chassis
Fig.
A-5
(Fig.
A-5-2)
(Fig.
A-5-1)
(Fig.
A-5-3)
(Fig.
A-5-5)
(Fig.
A-5-4)
BASE ASSEMBLY P4 (FIG. A-5-1)
1) Carefully pry up Tab (A) to clear the embossed tab on
the chassis.
2) Turn the Base assembly P4 counterclockwise and lift
it up.
17. OPENER LID (FIG. A-5-2)
1) Carefully pry up Tab (B) to clear the embossed tab on
the chassis.
2) Turn the Opener Lid clockwise and lift it up.
18. ARM ASSEMBLY PINCH (FIG. A-5-3)
Lift the Arm assembly Pinch up.
LEVER T/UP (FIG. A-5-4)
ARM T/UP (FIG. A-5-5)
1) Unhook the Hook (H13) of the bottom Chassis and
lift the Lever T/up.
2) Lift the Arm T/up.
NOTE:
When reassembling, confirm that the (C) portion
of the Arm assembly Pinch is inserted to the Chassis
Hole correctly as Fig. Place the Mechanism upside-
down.
All manuals and user guides at all-guides.com
Summary of Contents for XBV243 series
Page 4: ... TOC 2 All manuals and user guides at all guides com ...
Page 36: ... 3 24 All manuals and user guides at all guides com a l l g u i d e s c o m ...
Page 80: ...All manuals and user guides at all guides com ...
Page 108: ...All manuals and user guides at all guides com ...
Page 109: ...All manuals and user guides at all guides com ...
Page 110: ...All manuals and user guides at all guides com ...