Mounting / changing the probe
6-8
61211-1270302
MMZ M
Mounting / changing the probe
What you should know!
NOTE
This chapter is only relevant if the CMM is prepared for a manual probe
change. In the »active« version, a VAST gold probe can be replaced with
an RDS articulating head.
After a probe change, measuring software adjustments may be neces-
sary.
–
Please also read the corresponding chapters in the operating instruc-
tions for the measuring software.
Fastening the probe holder and the probe
How to fasten the RDS articulating system and a VAST probe to the ram
is described below.
Fastening the RDS
The articulating system is slid onto the dovetail guide of the ram and se-
cured with a screw.
1 Ram
2 Groove for pin
3 Dovetail guide on the ram
4 Pin
5 RDS articulating system
Summary of Contents for MMZ M
Page 18: ...Warranty 1 6 61211 1270302 MMZ M ...
Page 65: ...4 61211 1270302 MMZ M 4 1 Technical data This chapter contains CMM 4 2 Technical data ...
Page 74: ...Installation 5 6 61211 1270302 MMZ M ...
Page 92: ...Start up checklist 6 18 61211 1270302 MMZ M ...
Page 118: ...Terminating the measuring operation 7 26 61211 1270302 MMZ M ...
Page 146: ...2Glossary 2 61211 1270302 MMZ M ...
Page 152: ...6Alphabetic index 6 61211 1270302 MMZ M ...
Page 153: ......
Page 154: ...MMZ M Operating Instructions 2021 10 05 61211 1270302 ...