Starting the CMM
6-6
61211-1270302
MMZ M
CMM starting sequence
Proceed in the following order when switching the controller on:
1
Connect the power supply; switch it on with the main switch.
[1]
2
Switch the controller on.
[2]
3
Activate the ram protection.
[3]
4
Turn the drives on.
[4]
5
Select the operating mode.
[5]
6
Switch the computer on and start the measuring software.
Start-up sequence
Connecting the power supply (1)
–
Turn the main switch clockwise to position «1».
The power supply for all electronic components of the CMM is
switched on.
Switching on the controller (2)
1
Turn the rotary switch to the «ON» position.
The indicator lamp of the switch lights up. The controller is on.
2
Wait for approx. 30 s before switching the drives on.
This is necessary because the internal computer of the controller re-
quires a certain amount of time to start. The starting process must
be completed before the drives are switched on. The LEDs on the
control console flash during the starting process.
Summary of Contents for MMZ M
Page 18: ...Warranty 1 6 61211 1270302 MMZ M ...
Page 65: ...4 61211 1270302 MMZ M 4 1 Technical data This chapter contains CMM 4 2 Technical data ...
Page 74: ...Installation 5 6 61211 1270302 MMZ M ...
Page 92: ...Start up checklist 6 18 61211 1270302 MMZ M ...
Page 118: ...Terminating the measuring operation 7 26 61211 1270302 MMZ M ...
Page 146: ...2Glossary 2 61211 1270302 MMZ M ...
Page 152: ...6Alphabetic index 6 61211 1270302 MMZ M ...
Page 153: ......
Page 154: ...MMZ M Operating Instructions 2021 10 05 61211 1270302 ...