
Start-up checklist
61211-8140502
METROTOM 1500 G3 1.4
6-13
Start-up checklist
Start of the CT system
–
Has the CT system been started in the correct order?
See
➤
Loading door
–
Have you initialized the loading door? See chapter »«.
User software
For the following operations, please refer to the METROTOM OS Operat-
ing Instructions.
–
User software started?
–
All X-ray components initialized?
Qualification and calibration
For the following operations, please refer to the METROTOM OS Operat-
ing Instructions.
–
Have you calibrated the detector?
Calibrate the detector once a month.
–
Have you qualified the geometry?
Qualify the geometry once a week.
–
Have you qualified the axis?
Qualify the axis once a week.
Summary of Contents for METROTOM 1500 G3
Page 8: ...6Table of contents 6 61211 8140502 METROTOM 1500 G3 1 4...
Page 18: ...Warranty 1 6 61211 8140502 METROTOM 1500 G3 1 4...
Page 72: ...Start up checklist 6 14 61211 8140502 METROTOM 1500 G3 1 4...
Page 104: ...Inspection measures 9 10 61211 8140502 METROTOM 1500 G3 1 4...
Page 110: ...2Glossary 2 61211 8140502 METROTOM 1500 G3 1 4...
Page 120: ......