
Preparation
6-2
61211-8140502
METROTOM 1500 G3 1.4
Preparation
Notes
The preparation includes activities that are not necessary to be carried
out on a daily or weekly basis. One exception to this is the visual check.
The visual check should be part of your daily CT scanning operations.
Initial start-up
Initial start-up is carried out by a ZEISS service engineer. However, you
must familiarize yourself with the preparations required for start-up as
well as know and observe the corresponding safety instructions.
–
Please also observe the information in chapter »Safety«.
Connecting power supply
The electrical power supply must be close to the installation site to allow
connecting the power supply to the CT system. This must be done be-
fore installing the CT scanner.
–
Please observe the electrical specifications.
NOTE
For more information on the electrical power supply, please refer to the
»Installation Instructions« brochure.
Visual check and check list
The visual check must be part of the routine work to be carried out dur-
ing the daily measuring operation. Before switching the CT scanner on,
make sure by means of a visual check that the measuring system com-
ponents do not show any visible damage.
In case of damage, …
Start-up of the CT scanner is not allowed in case of damage to the CT
scanner.
1
In this case, protect the CT scanner against switching on.
Turn off the main switch and lock it with a padlock.
Turn the key switch for operating mode setting to the «OFF» posi-
tion and withdraw the key.
2
Inform a ZEISS service engineer.
Summary of Contents for METROTOM 1500 G3
Page 8: ...6Table of contents 6 61211 8140502 METROTOM 1500 G3 1 4...
Page 18: ...Warranty 1 6 61211 8140502 METROTOM 1500 G3 1 4...
Page 72: ...Start up checklist 6 14 61211 8140502 METROTOM 1500 G3 1 4...
Page 104: ...Inspection measures 9 10 61211 8140502 METROTOM 1500 G3 1 4...
Page 110: ...2Glossary 2 61211 8140502 METROTOM 1500 G3 1 4...
Page 120: ......