Securing the standard base
To ensure the stability of the CMM, the standard base must be anchored to the floor.
The fastening material for the base is included with delivery.
Note:
The boreholes to anchor the base must be drilled by the customer for warranty reasons.
580
910
620
732
Position of the boreholes for the standard base (top view), M 1:10, dimensions in millimeters
2 plug screws are included with delivery to anchor the standard base to the floor (foundation). The plug screws must
be anchored into the foundation.
There is a risk of tipping if not properly anchored.
If the floor is too thick and the plug screws cannot be anchored sufficiently as a result, there is a
risk of tipping.
In this case, customers must provide sufficiently long plug screws.
NOTE
The plug screws are not tightened. There must be a gap of 1-2 mm between the head of the plug
screw and the base. This provides the necessary tilt protection and does not have a negative effect
on the 3-point support of the base.