![Zeiss Crossbeam 350 Instruction Manual Download Page 93](http://html.mh-extra.com/html/zeiss/crossbeam-350/crossbeam-350_instruction-manual_927679093.webp)
ZEISS
7 Maintenance and Repair | 7.1 Maintenance Work
7 Maintenance and Repair
7.1 Maintenance Work
The preventive maintenance is performed by the ZEISS service representative and includes the fol-
lowing items:
§
Inspection
§
Preventive maintenance work
§
Change of consumables and chemicals
§
Equipment test
§
Verification run
Info
The maintenance work is accomplished according to standardized maintenance plans and is
recorded by the ZEISS service representative.
7.2 Maintenance Intervals
The maintenance intervals depend on the period of application of the device:
§
24 hours, 7 days a week: semiannually
§
8 hours, 5 days a week: annually
Info
Keep track of maintenance work and contact the ZEISS service representative in time.
A list of ZEISS locations and authorized service partners can be found at:
http://www.zeiss.com/microscopy
Instruction Manual ZEISS Crossbeam 350 | en-US | Rev. 3 | 349500-8111-000
93