Installation
4-5
CenterMax Operating Instructions
61211-1020202
Prerequisites for installation
The following preparations must be made prior to installation of the
CMM by ZEISS service engineers:
–
Provision of steel plates
–
Installation of power supply
–
Installation of compressed-air supply
–
Adaptation of CMM to room temperature
You will find the data required for preparation in the document
"Installation Instructions“.
Adaptation to room temperature
During start-up of the CMM, the temperature of all CMM parts must
be stabilized at a minimum temperature of 15°C.
At least two days in
advance
• Store all parts of the CMM in a place having an ambient tempera-
ture of at least 15°C at least two days prior to installation.
Summary of Contents for CenterMax
Page 1: ...Operating Instructions CenterMax Coordinate measuring machine for series production...
Page 9: ...61211 1020202 Operating Instructions Contents7 Appendix Application examples 1...
Page 10: ...61211 1020202 Operating Instructions Contents 8...
Page 14: ...Foreword 61211 1020202 Operating Instructions...
Page 26: ...1 12 Introduction 61211 1020202 CenterMax Operating Instructions...
Page 58: ...3 6 Technical data 61211 1020202 CenterMax Operating Instructions...
Page 64: ...4 6 Transport and installation 61211 1020202 CenterMax Operating Instructions...
Page 80: ...5 16 Preparations for start up 61211 1020202 CenterMax Operating Instructions...
Page 100: ...6 20 Start up 61211 1020202 CenterMax Operating Instructions...
Page 134: ...7 34 Measuring operation 61211 1020202 CenterMax Operating Instructions...
Page 144: ...8 10 Errors and faults 61211 1020202 CenterMax Operating Instructions...
Page 156: ...9 12 Maintenance and care 61211 1020202 CenterMax Operating Instructions...
Page 162: ...61211 1020202 Operating Instructions Glossary 2...
Page 164: ...61211 1020202 Operating Instructions Appendix 2...
Page 165: ......