Main Document Only.
30/50
Identification: MD-AL-GI-00
Rev. 1.0 07.06.21 - Application: GID
Connext User Manual
Rev. 1.2 07/06/2021
The figure shows the direction of the arrow found on the current
sensor. Pay attention to the insertion direction
Note
4.4.4.
Meter for measuring grid exchanges (three-phase
system)
If there is no storage system inverter belonging to the Azzurro brand and the grid exchange needs
to be measured, it is necessary to install an accessory meter (ZSM-METER-DTSU).
The meter must be placed directly on the output of the exchange energy meter and connected to
the Connext system via port RS485, as indicated below.
Figure 23 – Meter connections
Meter pin
24-pin terminal block
24
9
25
10
Table 16 – RS485 connections to three-phase meter
Follow the specific meter manual for the correct configuration, setting the communication to
32
.