User Manual 3PH HYD5000-HYD20000-ZSS
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1. of 16/03/2021 - Application: GID
73/138
7.2.
Commissioning
Before starting the actual operation of the inverter, some parameters will need to be set, as shown in
the table below.
Parameters
Notes
1. OSD language options
Default English
2. Setting of date and time, confirmation
If the inverter is connected to a PC or
mobile app, the time should be set to
the local time
*3. Importing of safety parameters
Find the file with the safety parameters
(renamed according to the country
selected) on the website, download
them to a USB stick and import them
4. Setting of input channel
Default order: BAT1, BAT2, PV1, PV2
*5. Setting of battery parameters
The default values are shown
according to the input channel
configured
6. The set-up is completed
Table 16 - Parameters to be set for first start-up
NB:
Zucchetti Centro Sistemi S.p.A. shall not be held responsible for any harmful
consequences resulting from the incorrect setting of the country code.
It is very important to make sure that the right country code has been
selected in accordance with the requirements of the local energy
authorities.
Consult with qualified and authorised personnel to ensure the correct
choice.
Caution