46 / 96
CAYMAN
Version 01 - Revision 00
09/05/2017
Mechanically connecting the attachment to the machine (bucket position)
For the following description, refer to
To mechanically connect the attachment to the machine, carry out the operations below in the following
order:
1� position the attachment as indicated in
(1)
, referring to
“5.1.3 handling and positioning instructions”
:
−
perfectly horizontally;
−
on a solid surface;
−
with the shears facing the operating position;
2� remove the bucket from the machine, referring to the machine’s manual;
3� connect the linkage connection
(2)
to the attachment by using the specific bolts;
4� retract the machine cylinder shaft
(3)
(bucket position) completely;
5� align the machine arm hole with the first hole
(4)
on the linkage connection;
6� connect the machine arm and the linkage by using the corresponding pin;
7� secure the pin, using the corresponding locking screw;
8� gently lift the machine arm, rotating the attachment until the second hole
(5)
on the linkage connection
is in the range of the cylinder shaft;
9� extract the cylinder shaft until the second hole on the linkage connection aligns with the shaft hole
(6)
;
10� insert the corresponding pin;
11� secure the pin by using the corresponding locking screw�
Summary of Contents for CAYMAN FCE II Series
Page 2: ......
Page 6: ...6 96 CAYMAN Version 01 Revision 00 09 05 2017...
Page 94: ...94 96 CAYMAN Version 01 Revision 00 09 05 2017...
Page 95: ......