zappi ZAPPI-2H07TB-G Quick Install Manual Download Page 1

Electric Vehicle (Smart Charge Points) Regulations 2021

 

From 30th June 2022, any EV charger installed in a private setting i.e. home or workplace NOT public, in 

 

England, Scotland 

and Wales has to meet the Electric Vehicles (Smart Charge Points) Regulations 2021. 

 

From 30th December 2022, further regulations come into force. 

 

To ensure all our 

are compliant by the date the regulations come into force we will be taking a phased approach with 

the implementation of certain features.

 

For  information  on  how  these  new  regulations  may  affect  you  and  your 

please  refer  to  the  full 

Installation Manual which can be found in the Download Centre on the 

website. 

 

Technical Support 

 

If you experience any issues during or post set

-

up, please contact our technical support team by scanning the QR Code 

below.

 

 

 

 

 

 

Please contact us directly for the quickest solution.

 

 

Below is your unique product identifier

 

Please register your new 

device at

 

 

https://myaccount.myenergi.com/registration

 

Installation Date:

 

Installer Contact Details: 

 

eco

-

smart EV charge points

 

Quick Install Guide

 

This document covers the following models:

 

 

Single phase: ZAPPI

-

2H07TB

-

G, ZAPPI

-

2H07TW

-

G, ZAPPI

-

2H07UB

-

G, ZAPPI

-

2H07UW

-

G

 

 

Three phase: ZAPPI

-

2H22TB

-

G, ZAPPI

-

2H22TW

-

G, ZAPPI

-

2H22UB

-

G, ZAPPI

-

2H22UW

-

G

 

`

 

NOTICE

 

When installing and wiring the 

care should be taken to maintain the IP rating of the unit.

 

  Ensure that the grommets and bungs provided are fitted,  the O

-

ring behind the cover is seated correctly and that the 

electricity cable and CT wires are fitted using an appropriate size and type of gland of at least IP65.

 

Overview

 

  with  model  number  beginning  2H  have  a  built

-

in  Ethernet  port  (RJ45  socket)  and  WiFi  to  connect  to  the  local        

network  (LAN).    They  also come  with  built

-

in 

  functionality  (

)  which  means  you  don’t  need  a  separate  hub  to  link 

your 

 devices to the internet or use the 

 app.

 

These  install  instructions  should  be  read  in  conjunction  with  the 

  Installation  Manual  which  can  be  found  in  the      

Download Centre of the 

 website.

 

Step 1: 

Remove 

from its 

packaging and keep all CT’s and 

fixing kit to one side. CT’s and 

fixing kit are enclosed within the 

cardboard packaging.

 

 

Single Phase 

-

 1 CT, Three Phase 

-

 3 CTs 

 

Step 2: 

Unscrew the cover and unclip 

flat ribbon cable.

 

· 

If fitting

 

 

an untethered 

protect 

the cover whilst it hangs down during 

installation.

 

· 

If tethered, unclip the ribbon cable and set the cover 

aside.

 

Step 3: 

If installing a tethered 

you will need to fit the 

enclosed cable wall guard to the 

unit using the  

4x 4mm x12mm

 

screws supplied. 

 

Step  4: 

There  are  4  possible  cable  entry 

positions,  carefully  decide  which  one  you  are 

going  to  use  from  this  image. 

You  will  need 

an IP65 or above rated cable gland.

 

Carefully drill hole into unit to match the size 

of your cable gland. Attach cable gland       
ensuring IP rating is maintained. 

 

Step 5: 

Using  the  enclosed  template 

mark all the mounting holes required.

 

· 

Use  top  and  2  bottom  holes  left  / 

right for brick (use 7mm dia. Masonry 

drill and the wall plugs provided. 

 

· 

Use 3 vertical holes if mounting to a 
stud wall or joist.

 

Step  6: 

To  maintain  the  IP  rating  of 

the unit you must ensure that the bungs 

provided  are  inserted  in  any  mounting 
holes that are not used.

 

UNITED KINGDOM

  

 

 

Revision 2.1.2, November 2022

  

 

 

 

 

 

 

 

 

 

 

 

                 

D3405

 

Reviews: